000 03730nam|a2200385 i 4500
005 20260818094608.0
008 030299s1985 th 0000|0 eng d
035 _a.b10222200
099 9 _aAIT Thesis no.GT-84-15
100 0 _aKangwan Srithanesphokai
245 1 0 _aEconomic feasibility of a u-turn overcrossing for traffic northbound from Don Muang airport, Bangkok
260 _aBangkok :
_bAsian Institute of Technology,
_c1985
300 _a46 p.
490 1 _aThesis ;
_vno. GT-84-15
500 _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
502 _aThesis (M.Eng.) - Asian Institute of Technology, 1985
520 _aBangkok International Airport, situated 25 km north of the city, has been provided with excellent highway access from the city, and the dominant ground traffic reaches the airport by this means. Commercial, industrial, and academic communities situated north of the airport have ready access from the north, but return trips to the north require initial travel of about 4.5 km southerly toward the city, a U-turn at Laksri Interchange, and a 4.5-km return in the northward direction prior to passing the airport in the intended direction. the objective of the present study was an evaluation of the economic and physical feasibility of a U-turn overcrossing of the Princess Viphavadi Rangsit Highway in the vicinity of the airport to avoid the need of the 9-km trip through the Laksri Interchange. Roadside interviews were conducted for 12 hours on each of three days to determine an origin-destination trip matrix for U-turning vehicles at the Laksri Interchange. Those trips which, because of origin or because of destination, could not benefit from a U-turn overcrossing in the vicinity of the airport were eliminated from further consideration. The candidate trip matrix was expanded to represent 24-hour movement, initially from the 60% sample of interviews by means of the 12-hour classified vehicle count of U-turning vehicles, and subsequently by 24/12-n ratios obtained from the Thai Department of Highways classified volume counts of through traffic southbound on Princess Viphavadi Rangsit Highway. Vehicle operating costs and the distance value of travel time were obtained from the Highway Department. These were applied to evaluate the benefits to be derived through elimination of the 9-km return trips presently required of traffic destined for locations north of the airport. A benefic/cost ratio of 4.0, and an internal rate of return of about 80% were calculated, based on an estimated investment of Baht 40-million for a new U-turn overcrossing.
650 0 _aTraffic engineering
_xThailand
_xBangkok
700 1 _aJones, John Hugh, IeChairperson
700 1 _aIshido, Akira,
_eExamination Committee
700 0 _aPrapansak Buranaprapa,
_eExamination Committee
710 2 _aRet-Ser Engineering Agency Taipei, Taiwan, Republic of China,
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. GT-84-15
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B20043
907 _a.b10222200
_bmnait
_cs
902 _a240329
998 _b2
_c951012
_dm
_ea
_fs
_g0
945 _lmnait
945 _lmnarc
942 _c22
942 _c40
909 _aBarcode : 30050120655211
_bCREATED : 2014-03-14
_cRECORD # : i12772471
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 1
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050160069109
_bCREATED : 2016-05-19
_cRECORD # : i12983123
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c33246
_d33246