000 03916nam a2200433 4500
005 20260818095507.0
008 280998s1990 th r 0000|0 eng d
035 _a.b10234937
099 9 _aAIT Thesis no. ET-90-8
100 1 _aSarkar, Ashok
245 1 0 _aElectricity interuption costs and power system reliability :
_ba case in India
260 _aBangkok :
_bAsian Institute of Technology,
_c1990
300 _a165 p.
490 1 _aThesis ;
_vno. ET-90-8
500 _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
502 _aThesis (M.Eng.) - Asian Institute of Technology, 1990
520 _aThe random nature of electricity generation systems, the uncertainties involved in demand and the problems associated with determining the consumer value of reliability complicates the process of generation capacity adequacy assessment more than ever before. While the cost of reliability improvement can be easily measured, customers' valuation of the improvement in service quality is difficult to quantify. This study estimates the costs of electricity outages and assesses the reliability worth of generation system in monetary terms by relating interruption costs with system reliability indices. The costs of unserved demands associated with particular level of generation reliability is determined from consumers' point of view. An empirical investigation through the survey of different categories of electricity users in the northern region of India was conducted to probe into the inconveniences faced due to electricity interruptions and the quantification of these was carried out. The study finds that the adaptive response investments made to ameliorate the impacts of interruptions have substantially displaced the potential direct outage costs. It reveals the importance of indirect outage costs in the reliability evaluation of long-term generation capacity expansion planning. A composite outage cost function has been generated for the region and has been used to analyze the monetary component associated with the conventional Electrical Energy Not Served (EENS) in different periods of the planning horizon. By including the outage costs in the economic reliability planning criterion, the socially acceptable levels of reliability are determined. The value of the reliability evaluation model for economic analysis of costs and benefits of alternative expansion plans and for the determination of the acceptable level of reliability is also emphasized.
650 0 _aElectric utilities
_xCosts
650 0 _aElectric power failures
700 1 _aShrestha, Ram M.,
_eChairperson
700 1 _aBhattacharya, Sribas C.,
_eExamination Committee
700 1 _aLapillonne, Bruno,
_eExamination Committee
700 1 _aCodoni, Rene,
_eExamination Committee
710 2 _aThe Royal Thai Government (King's Scholarship),
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. ET-90-8
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B18312
907 _a.b10234937
_bmnait
_cx
902 _a240401
998 _b2
_c951012
_dm
_ea
_fx
_g0
945 _lmnait
945 _lmnait
945 _lmnarc
942 _c20
942 _c40
909 _aBarcode : 30050003105425
_bCREATED : 1995-10-14
_cRECORD # : i10287139
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050003578811
_bCREATED : 1995-10-14
_cRECORD # : i10287140
_dLPATRON : 1015422
_eLCHKIN : 2004-11-05
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 4
_jTOT RENEW : 7
909 _aBarcode : 30050120344550
_bCREATED : 2016-06-15
_cRECORD # : i13040224
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c35994
_d35994