000 03924nam a2200409 4500
005 20260818095913.0
008 290998s1994 th r 0000|0 eng d
035 _a.b10244657
099 9 _aAIT Thesis no. ET-94-9
100 0 _aChannarong Boonratanasmai
245 1 0 _aEnergy targeting and planning :
_bcase study on Montien Hotel
260 _aBangkok :
_bAsian Institute of Technology,
_c1994
300 _a76 leaves +1 online resource
490 1 _aThesis ;
_vno. ET-94-9
500 _aA thesis submitted in partial fulfillment of the requirement for the degree of Master of Engineering
502 _aThesis (M.Eng.) - Asian Institute of Technology, 1994
520 _aThe economic growth rate of Thailand over the past year has resulted in a high rate increase of energy consumption which is varied in a wide range due to the diversity in design construction, using purpose, operating period, etc. To consider the way for finding suitable amount of energy consumption of each space building, energy target for improved planning is need. In this study, the energy target was conducted at Montien hotel Pattaya, Purposed by The Hotel Association Pattaya and Surapong C., is modify by considering the effects of (i) different types of areas (spaces), (ii) the use of OTTV calculation and Lighting, daylighting application. Montien Hotel comprised with 4 building, Main building (guess Room), Orchid and Cattaleya which are composed of seminar room and conference room. Finally Arcade building purposed for shopping center and fitness club. After the analysis of past five years annual energy data and doing energy audit from the hotel completed, the table for setting energy target is created then data from energy audit and minimum standard from ECPA are fill to compare the existing and minimum requirement. The final result of energy target was adjusted for improvement and planning which is set up by applied 2 energy consumption activities, false wall to decrease OTTV and Day lighting to decrease lighting power consumption. The result is found that the existing energy index (kWh/year*m²) of this hotel is 250-300 kWh/yr*m² approximately which equal to the result was done by Surapong C. and Bundit. L was conducted in 3 sample hotels located in Bangkok, 1992, however some spaces still over than minimum standard ECPA. After applied false wall and daylighting application the hotel should saving 931,899 Baht/year with 2 year payback period which affect to energy index target for improved planning is decreased to 200-250 kWh/yr*m² by average. Additionally the hotel is replacing the artificial lighting from incandescent lamps to compact fluorescent lamps which saving is 40,946 Baht/year and 1.6 year approximately.
650 0 _aEnergy policy
700 0 _aSurapong Chiraratananon,
_eChairperson
700 1 _aKarmazsin, Etienne,
_eExamination Committee
700 0 _aGiap Van Dang,
_eExamination Committee
710 2 _aThe Government of Japan,
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. ET-94-9
856 _3Full-Text
_u http://203.159.5.9/ait-thesis/detail.php?q=B16222
907 _a.b10244657
_bmnait
_cx
902 _a240401
998 _b1
_c951210
_dm
_ea
_fx
_g0
945 _lmnait
945 _lmnait
945 _lmnarc
942 _c20
942 _c40
909 _aBarcode : 30050003107298
_bCREATED : 1994-07-13
_cRECORD # : i11703970
_dLPATRON : 1024857
_eLCHKIN : 2014-08-29
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 1
_jTOT RENEW : 0
909 _aBarcode : 30050003107306
_bCREATED : 1994-07-13
_cRECORD # : i11703982
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 2
_jTOT RENEW : 0
909 _aBarcode : 30050120367247
_bCREATED : 2016-06-13
_cRECORD # : i13033220
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c37697
_d37697