| 000 | 03568nas a2200397 a 4500 | ||
|---|---|---|---|
| 005 | 20260818112743.0 | ||
| 008 | 230725s2023 th uu m rtt 0| a1eng d | ||
| 035 | _a.b12409194 | ||
| 099 | 9 | _aAIT Thesis no.GE-22-07 | |
| 100 | 1 | _aNeaupane, Allan Sharma | |
| 245 | 1 | 0 | _aEvaluation of jet grouting design parameters for TBM launching and arrival in Thailand |
| 260 |
_aPathum Thani, Thailand : _bAsian Institute of Technology, _c2023 |
||
| 300 |
_a163 leaves : _bill. |
||
| 490 | 1 |
_aThesis ; _vno. GE-22-07 |
|
| 500 | _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Geotechnical and Earth Resources Engineering | ||
| 502 | _aThesis (M. Eng.) - Asian Institute of Technology, 2023 | ||
| 520 | _aIn metropolitan areas, it is crucial to use ground stabilization and improvement techniques when carrying out soft ground tunneling. This involves various aspects such as designing, treating the ground, construction techniques, material properties, for launching and arrival of large-diameter tunnel boring machines (TBM{u2019}s) from underground stations and shafts, all while dealing with different geological conditions. To ensure the stability of the soil and control groundwater, it is necessary to improve the soil before the TBM{u2019}s breakthrough. In many underground projects, jet grouting is commonly used as an improvement technique to strengthen the soft ground, maintain TBM stability, and prevent groundwater leakage while maintaining a safe margin. Due to the complexities of the site conditions, the dimensions of the construction may be different from the original design. This study aims to evaluate the actual construction dimensions and compare them with the design dimensions. Additionally, a parametric study was conducted using numerical analysis software to investigate the effects of modifying certain jet grouting design parameters on soil stability and seepage issues when the diaphragm wall is opened for TBMs launching and arrival in Thailand. This paper discusses the results of the comparison between actual construction dimensions with calculated design guideline dimensions. The study revealed that most construction dimensions exceed the design dimensions, and the strength of the jet grouting mixture plays a significant role in determining the size of the jet grouting blocks. Moreover, the outcomes of the parametric studies proposes a trend for enhancing the design dimensions of jet grouting in future projects in Thailand. | ||
| 650 | 0 |
_aBoring machinery _xDesign and construction. |
|
| 650 | 0 |
_aSubsoils _zThailand |
|
| 650 | 0 |
_aGrouting (Soil stabilization) _vEvaluation |
|
| 700 | 1 |
_aChao, Kuo Chieh, _eChairperson |
|
| 700 | 0 |
_aAvirut Puttiwongrak, _eExamination committee |
|
| 710 | 2 |
_aAsian Institute of Technology Scholarships, _eScholarship Donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. GE-22-07 |
|
| 856 | 4 | 0 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B19495 |
| 907 |
_a.b12409194 _bmnait _cm |
||
| 902 | _a250421 | ||
| 998 |
_b0 _c230725 _dm _ea _fm _g0 |
||
| 945 | _lmnarc | ||
| 945 | _lmnarc | ||
| 942 | _c40 | ||
| 942 | _c61 | ||
| 909 |
_aBarcode : 30050121040363 _bCREATED : 2023-07-21 _cRECORD # : i13456933 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : - _bCREATED : 2023-07-21 _cRECORD # : i13456945 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c41049 _d41049 |
||