| 000 | 03382nas|a2200397 i 4500 | ||
|---|---|---|---|
| 005 | 20260818112819.0 | ||
| 008 | 121095s1994 th uu m rtt 00| a1eng d | ||
| 035 | _a.b10261552 | ||
| 099 | 9 | _aAIT RSPR no. IR-93-01 | |
| 100 | 1 | _aRahman, Md. Mujibur | |
| 245 | 1 | 0 |
_aEvaluation of small scale water resources development in Bangladesh : _ba case study of an embankment project in the Haor area |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1994 |
||
| 300 | _a75 leaves | ||
| 490 | 1 |
_aResearch studies project report ; _vno. IR-93-01 |
|
| 500 | _aA research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Environment, Resources and Development | ||
| 502 | _aResearch Studies Project Report (M. Eng.) - Asian Institute of Technology, 1993 | ||
| 520 | _aTo evaluate the "Haizda Embankment Project" contribution, overall condition of the farmers (within the project area) what was before the project construction as well as the present situation were considered. Expected outcome from the project implementation was also considered in this regard. The findings of this study are, due to the project construction farmers are giving more attention for Boro cultivation as well as use of HYV seeds, use of fertilizer, use of insecticide, labor employment and farmers yearly income significantly increased. On the other hand, crop damages through early flood, insufficient irrigation water and drainage congestion significantly decreased. Overall water management situation and transportation facilities are increased within the project area except there are little adverse effect on fish production within the project area and water management situation outside the project area somewhat interrupted through the construction of embankment. Except little adverse effect, the project has several fruitful impacts on the project area but not at the expected level. The causes behind it may be as : firstly, the project was constructed only two years before and secondly, some of the essential components of the project not yet been installed. Finally, it is seem that the partial flood control projects are more suitable rather than the full control or polder type of projects in the Haor areas of Bangladesh. | ||
| 650 | 0 |
_aWater resources development _xBangladesh |
|
| 650 | 0 |
_aEmbankments _xBangladesh |
|
| 700 | 1 |
_aKono, Yasuyuki, _eChairperson |
|
| 700 | 1 |
_aMurali, N.S., _eExamination committee |
|
| 700 | 1 |
_aMurty, V.V.N., _eExamination Committee |
|
| 710 | 2 |
_aGerman Academic Exchange Service (DAAD), Government of the Federal Republic of German, _eScholarship donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tResearch studies project report ; _vno. IR-93-01 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B15504 |
||
| 907 |
_a.b10261552 _bmnait _cy |
||
| 902 | _a240401 | ||
| 998 |
_b2 _c951012 _dm _ea _fy _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c20 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050003111837 _bCREATED : 1995-10-14 _cRECORD # : i10321639 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050160106984 _bCREATED : 2016-04-20 _cRECORD # : i12941542 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c41225 _d41225 |
||