000 03422nas|a2200421 i 4500
005 20260818112858.0
008 020111s2001 th uu m rtt 00| a1eng d
035 _a.b11841953
099 9 _aAIT RSPR no. SM-01-53
100 0 _aSomsouk Soutchalit
245 1 0 _aEvaluation of the Vientiane integrated urban development project
260 _aBangkok :
_bAsian Institute of Technology,
_c2001
300 _a70 leaves
490 1 _aResearch studies project report ;
_vno. SM-01-53
500 _aA research study submitted in partial fulfiJlment of the requirements for the degree of Master of Business Administration, School of Management
502 _aResearch Studies Project Report (M.B.A.) - Asian Institute of Technology, 2001
520 _aThe VIUDP were implemented to improve the environment of Vientiane. This research presents the implementation perf01mance, the operational impact and sustainability. The evaluation was based on concept, methodology in project management; SWOT analysis, the lessons learned from previous research in Asia and from the project financed by ADB. The data were collected from questionnaires, documents and by the observation on site. We found that the project even completed, were not achieving his objective. Some work components, such as constrnction of retarding basin, micro-finance for sanitation improvement were cancelled. The construction and rehabilitation of roads and drainage systems were not reach with his previous objectives. The operation and maintenance of the constructed facilities even are inadequate; we can find the improvement of urban environment within Vientiane Prefecture. The communication and participation of local community, the orientation to demand-led criteria, cost recovery, choice of contractors, better project management, and a creation a pilot area are essential for success of the project. In order to get a fully benefit from the project, continuation for the improvement is needed. Construction of hard components should be completed with soft components such as campaign for sanitation, health access education, and capacity building.
650 1 0 _aCommunity development, Urban
_xLaos
_xVientiane
700 1 _aBroustai, Joel Francois,
_eChairperson
700 0 _aSununta Siengthai,
_eExamination Committee
700 1 _aTruong, Quang,
_eExamination Committee
710 2 _aThe Government of Switzerland/Swiss Development Corporation, Scholarship donor
810 2 _aAsian Institute of Technology.
_tResearch studies project report ;
_vno. SM-01-53
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B07213
907 _a.b11841953
_bmnait
_cu
902 _a240617
998 _b0
_c020111
_dm
_ea
_fu
_g0
945 _lmnait
945 _lmnait
945 _lmnarc
942 _c20
942 _c22
942 _c40
909 _aBarcode : 30050120993901
_bCREATED : 2002-11-01
_cRECORD # : i12266346
_dLPATRON : 1017006
_eLCHKIN : 2006-04-21
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 1
_jTOT RENEW : 1
909 _aBarcode : 30050120611180
_bCREATED : 2012-10-10
_cRECORD # : i12702560
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050160083597
_bCREATED : 2016-04-05
_cRECORD # : i12971182
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c41428
_d41428