000 03663nas a2200421 a 4500
005 20260817162251.0
008 170203s2015 th uu m rtt 000 eng d
035 _a.b1217869x
099 9 _aAIT Thesis no.OTM-15-05
100 0 _aThaw Tar Soe Oo
245 1 0 _aAnalysis and evaluation of fixed jacket installation delays
260 _aPathum Thani, Thailand :
_bAsian Institute of Technology,
_c2015
300 _a52 leaves :
_bill. (some col.)
490 1 _aThesis ;
_vno. OTM-15-05
500 _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering inOffshore Technology and Management, School of Engineering and Technology
502 _aThesis (M.Eng.) - Asian Institute of Technology, 2015
520 _aThe objective of this study is to propose a systematic approach about analyzing and evaluation of delay on offshore installation of Jacket.This study incorporates with statistics of past projects data and viewing the report documents into identifying the causes of delay of installation of jacket to predict the probability of delay and delay hours. Once causes of delay are identified, data collection would be the first step to be done to decide the best fitted continuous distribution based on how much data available which will be used as input variables in probabilistic-based model. Then, the Monte Carlo simulation would be used to predict theprobability of output, in other words, to predict the probability of occurring delay and delay hours in installation of jacket. After that, the practical response plan regarding delay would be decided in term of different options. Finally, this study would end up with the comparison of money loss caused by delay and implementation cost to prepare according response plan. The proposed systematical procedure above was applied to installation of 4-legs jacket installation as a case study of this paper.The result of this study can be applied for both in project planning and strategic decision making to prevent the liquidate damage or penalty in bidding stage. Finally, the case study shows that the proposed procedure could be used as a powerful tool to reduce or deal with delay and it could be a very helpful information for decision maker.
650 0 _aOffshore structures
_xDesign and construction
_xDecision making
700 1 _aChiu, Gregory L.F.,
_eChairperson
700 1 _aBoswell, Laurence F.,
_eExamination committee
700 0 _aSarunphong Articharte,
_eExamination committee
710 2 _aGreater Mekong Subregion (GMS),
_eScholarship donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. OTM-15-05
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B03645
907 _a.b1217869x
_bmnait
_cm
902 _a240409
998 _b0
_c170203
_dm
_ea
_fm
_g0
962 _a000:001:PDF:b1217869:002943:0:0:0:0:0:0
_tAbstract
_vn
945 _lmnait
945 _lmnait
945 _lmnarc
942 _c20
942 _c40
909 _aBarcode : 30050120326409
_bCREATED : 2017-03-02
_cRECORD # : i13067047
_dLPATRON : 1027020
_eLCHKIN : 2018-01-22
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 3
_iTOT CHKOUT : 2
_jTOT RENEW : 1
909 _aBarcode : 30050120326201
_bCREATED : 2017-03-02
_cRECORD # : i13067059
_dLPATRON : 1027020
_eLCHKIN : 2017-07-12
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 3
_iTOT CHKOUT : 7
_jTOT RENEW : 0
909 _aBarcode : 30050120401343
_bCREATED : 2017-09-29
_cRECORD # : i13105371
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c4496
_d4496