| 000 | 03596nas|a2200397 a 4500 | ||
|---|---|---|---|
| 005 | 20260817162303.0 | ||
| 008 | 101004s2010 th uu|m rtt 0| a1eng d | ||
| 035 | _a.b12084098 | ||
| 099 | 9 | _aAIT RSPR no.ET-10-03 | |
| 100 | 1 | _aTran Thi Kieu Ngoc | |
| 245 | 1 | 0 | _aAnalysis of a micro combined heat power as a clean development mechanism project in residential ara, Hanoi, Vietnam |
| 260 |
_aPathum Thani, Thailand : _bAsian Institute of Technology, _c2010 |
||
| 300 |
_a52 leaves : _bill. |
||
| 490 | 1 |
_aResearch studies project report ; _vno. ET-10-03 |
|
| 500 | _aA research submitted in partial fulfillment of the requirements for the Degree of Master of Science in Energy Economics and Planning | ||
| 502 | _aResearch Studies Project Report (M. Eng.) - Asian Institute of Technology, 2010 | ||
| 520 | _aMicro Combined Heat and Power project for residential Building is one solution to reach target carbon emission reduction and energy saving in Hanoi, Vietnam. Target of this study is to analyze a case study for producing a Project Design Document (PDD) of Clean Development Mechanism (CDM) project cycle. Micro Combined Heat and Power project has two components are a MCHP with the total capacity of 846 kW and an absorption chiller. Propose electricity generation is 7.410.960 kWh/year. This study includes 3 objectives as follows: (1) To establish the baseline emission as well as calculate total weigh of reduction in GHG emission if implement proposed project; (2) Carrying out additionality analysis for this CDM project evolving sustainable development assessment; (3) Implementing financial analysis of this project with considering as CDM project. The result of this project, the baseline emission is 5476,91 tC02 per year. Due to the project emissions is 593,78 tC02 per year and leakages are obtained as zero, the emission reduction by the project can be calculate by subtracting project emission to baseline emission thus it is obtain to be 4883 tC02 per year. In addition, the additionality in this project is analysis as investment barrier, due to the calculation IRR is not so high when doing financial analysis it only 14%. So, financing is the main barrier for the implementation of the propose project. The assessment of sustainable development needs to ensure that the proposed project meets the requirement of the host country. The financial analysis shows that whether the project is financially attractive or not with including or excluding the proposed CDM project | ||
| 650 | 0 |
_aClean energy _zVietnam _zHanoi |
|
| 700 | 1 |
_aMarpaung, Charles O.P., _eChairperson |
|
| 700 | 1 |
_aSalam, Abdul P., _eExamination Committee |
|
| 700 | 1 |
_aSingh, Jai Govind, _eExamination Committee |
|
| 710 | 2 |
_aElectricity of Vietnam (EVN), _eScholarship donor |
|
| 710 | 2 |
_aAIT fellowship, _eScholarship donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tResearch studies project report ; _vno. ET-10-03 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B01331 |
||
| 907 |
_a.b12084098 _bmnait _cu |
||
| 902 | _a240329 | ||
| 998 |
_b0 _c101004 _dm _ea _fu _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c22 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050120613681 _bCREATED : 2012-07-09 _cRECORD # : i12693893 _dLPATRON : 1024858 _eLCHKIN : 2016-05-03 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 1 _iTOT CHKOUT : 1 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050120220958 _bCREATED : 2016-01-04 _cRECORD # : i12918830 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c4563 _d4563 |
||