| 000 | 03388nas|a2200385 a 4500 | ||
|---|---|---|---|
| 005 | 20260817162303.0 | ||
| 008 | 100216s2008 th uu|m rtt 0| a1eng d | ||
| 035 | _a.b12073192 | ||
| 099 | 9 | _aAIT RSPR no.ET-08-02 | |
| 100 | 0 | _aSok Chandavy | |
| 245 | 1 | 0 | _aAnalysis of a mini-hydropower plant as a clean development mechanism project in Siem Reap Province, Cambodia |
| 260 |
_aPathum Thani, Thailand : _bAsian Institute of Technology, _c2008 |
||
| 300 |
_a64 leaves : _bill. |
||
| 490 | 1 |
_aResearch studies project report ; _vno. ET-08-02 |
|
| 500 | _aSubmitted in partial fulfillment of the requirements for the degree of Master of Engineering in Energy | ||
| 502 | _aResearch Studies Project Report (M. Eng.) - Asian Institute of Technology, 2008 | ||
| 520 | _aMini-Hydropower Project for Rural Electrification is constructed in Cambodia of Siem Reap province. This project is analyzed as a case study for developing a Project Design Document (PDD) of the Clean Development Mechanism (CDM) project cycle. Mini»Hydropower project has two schemes such as K1 and K2 scheme that have the total capacity of 1,385 kW, and an annual electricity generation of 6, 199,758.6 kWh/year. The objectives of this research study are the following: (I) to establish the baseline emission and determine the level of Greenhouse Gas (GHG) emissions reduction from the proposed project, (2) to carry out addtionality analysis for the proposed project and assess the sustainable development effect of the project, and (3) to carry out financial analysis of the proposed project under the CDM project. In this project, the baseline emission is obtained to be 4,960 tCO₂ per year. Since the project emissions (i.e. emissions from hydro plant) and leakage are zero, the emission reduction by the project activity equals the baseline emission. Moreover, the additionality in this project is the main investment barrier, as because the calculation of financial analysis shows a very low IRR of only 6.31 %. So, this is the main barrier for the implementation of the project activity. The assessment of sustainable development needs to ensure that the proposed project meets the requirement of the host country. The financial analysis shows that whether the project is financially attractive or not with including or not including the proposed CDM project | ||
| 650 | 0 |
_aHydroelectric power plants _zCambodia _xSiem Reap |
|
| 700 | 1 |
_aShrestha, Ram M., _eChairperson |
|
| 700 | 1 |
_aKumar, Sivanappan, _eExamination Committee |
|
| 700 | 1 |
_aWang, Yaw Juen, _eExamination committee |
|
| 710 | 2 |
_aGovernment of France, _eScholarship donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tResearch studies project report ; _vno. ET-08-02 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B01326 |
||
| 907 |
_a.b12073192 _bmnait _cu |
||
| 902 | _a240329 | ||
| 998 |
_b0 _c100216 _dm _ea _fu _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c22 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050120379366 _bCREATED : 2012-07-09 _cRECORD # : i12694253 _dLPATRON : 1026628 _eLCHKIN : 2017-04-25 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 2 _iTOT CHKOUT : 4 _jTOT RENEW : 7 |
||
| 909 |
_aBarcode : 30050120221014 _bCREATED : 2016-01-04 _cRECORD # : i12918775 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c4564 _d4564 |
||