000 03634nam a2200421 4500
005 20260817162305.0
008 th eng
035 _a.b11711607
099 9 _aAIT Thesis no. ISE-97-30
100 0 _aSetya Murdapa
245 1 0 _aAnalysis of a stochastic multistage production line system under CONWIP/Finite buffers control by decomposition
260 _aBangkok :
_bAsian Institute of Technology,
_c1997
300 _a73 p.
490 1 _aThesis ;
_vno. ISE-97-30
500 _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Advanced Technologies
502 _aThesis (M.Eng.) - Asian Institute of Technology, 1997
520 _aIn recent times, there is a great pressure on production line to have minimum total inventory for getting more benefits. Some years after the success of Toyota Motor Co. applying Kanban system, a new effort to go to a lean production line is proposed, i.e. CONWIP. CONWIP sets the total inventory in constant level. However, the CONWIP assumes that the capacity of the buffers are unlimited. It is not possible in the real production line. This study is trying to observe what will happen if the CONWIP control is combined with the (TOYOTA) kanban control on a multistage production line. The idea was firstly proposed by Bonvik (I 996). In this paper, just a simple way is conducted to get the solution. Two algorithms, i.e. Frein-Commault-Dallery's algorithm for close-line system and Di Mascolo David-Dallery's algorithm for assembly/disassembly system, are combined to a new algorithm to analyze the performance of a CONWIP/Finite buffers controlled production line. This method is simple because it only uses the two-machine line formula as the basic analytical calculation in the decomposition analysis. By adding some more approximations for numerical calculating needs, the results are satisfying (with error less than 10%) compared with simulation results for less reliable production line. It means that approximating numerically the reliability of Machine S is in fact not sufficient for more/very reliable line. Anyway, an analysis of the CONWIP/Finite buffers control is conducted, though limited to this less reliable line. Hence some conclusions can be noted based on this simple numerical calculation method.
650 1 0 _aAssembly-line methods
650 1 0 _aBuffer storage (Computer science)
700 1 _aNagarur, Nagendra N.,
_eChairperson
700 1 _aPastijn, Hugo,
_eExamination committee
700 1 _aPandey, P.C.,
_eExamination committee
710 2 _aSlamet Rijadi Foundation Yogyakarta, Indonesia,
_eScholarship donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. ISE-97-30
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B14398
907 _a.b11711607
_bmnait
_cy
902 _a240403
998 _b0
_c980521
_dm
_ea
_fy
_g0
945 _lmnait
945 _lmnait
945 _lmnarc
942 _c20
942 _c40
909 _aBarcode : 30050120815328
_bCREATED : 1998-05-21
_cRECORD # : i12069115
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050120815310
_bCREATED : 1998-05-21
_cRECORD # : i12069127
_dLPATRON : 1016514
_eLCHKIN : 2004-08-23
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 5
_jTOT RENEW : 1
909 _aBarcode : 30050160099148
_bCREATED : 2016-04-28
_cRECORD # : i12959728
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c4573
_d4573