000 03517nam a2200385 4500
005 20260817162319.0
008 270798 th eng
035 _a.b10080727
099 9 _aAIT Thesis no.ST-90-02
100 1 _aLiang, Alexander Su Fat
245 1 0 _aAnalysis of construction methods for the Kra-canal excavation
260 _aBangkok :
_bAsian Institute of Technology,
_c1990
300 _a150 p.
490 1 _aThesis ;
_vno. ST-90-02
500 _aA thesis submitted in partial fulfillments of the requirements for the degree of Master of Engineering, School of Engineering and Technology
502 _aThesis (M.Eng.) - Asian Institute of Technology, 1990
520 _aAn attempt has been made in this study to anallse the application of several construction methods using different combinations of equipment, such as dragline-dump trucks, dragline-belt conveyor system, s hove l-dump trucks , shovel-be ! t conveyor system, dredger-:-barges , dredger-pipe line system, railroad equipment, bucket wheel excavator, and scrape r-pushers in the Kra-canal excavation works. The canal alignment is divided into several sections; chainage km 0 - 2, km 2 - 5, km 5 - 13, km 13 - 20, km 20 - 75, km 75 - 102 based on the material encountered in each section. The equipment selected to be used in each section depends on its suitability and ability to perform the required excavation and transportation operation in the existing ground condition. Because huge quantities of earth are to be moved, economy can be achieved only by using big sized tailor-made equipment. Theoretic al production and unit cost of moving the earth for each system were calculated using queueing theory . The optimum allocation of material from different sources to different destinations for chainage km 20 - 75 we re then determined using the uni t costs obtained from the application of queueing models and by applying the transportation mode ls. The total cost of earth- moving for each chainage were calculated based on the quantities derived f rom the canal cross sections and the unit cost s for different methods . These costs were then compared to select that combination of equipment which gives the optimum costs. It was found that a combination of dragline-conveyor system, shove l - trucks , dragline-conveyor system, shove l - dump trucks, s hove l-dump trucks, and shovel - belt conveyor system respectively are the cheapest options for chainage km 0 - 2, km 5 - 13, km 13 - 20, km 20 - 75, km 75 - 102.
650 0 _aKra Canal
700 1 _aChauhan, Roshan Lal,
_eChairperson
700 1 _aUeda, Tamon,
_eExamiantion Committee
700 1 _aJearkjirm, Vithool,
_eExamination Committee
710 2 _aGovernment of F.R. of Germany,
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. ST-90-02
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B18540
907 _a.b10080727
_bmnait
_cs
902 _a240410
998 _b2
_c951012
_dm
_ea
_fs
_g0
945 _lmnait
945 _lmnarc
942 _c22
942 _c40
909 _aBarcode : 30050120692693
_bCREATED : 2014-02-04
_cRECORD # : i12786032
_dLPATRON : 1024795
_eLCHKIN : 2015-03-03
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 1
_jTOT RENEW : 0
909 _aBarcode : 30050160068606
_bCREATED : 2016-08-04
_cRECORD # : i12932255
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c4649
_d4649