| 000 | 03121cam a2200385 i 4500 | ||
|---|---|---|---|
| 005 | 20260817162331.0 | ||
| 008 | 231198s1993 th r 0000|00eng d | ||
| 035 | _a.b10080971 | ||
| 099 | 9 | _aAIT Thesis no.GT-92-05 | |
| 100 | 1 | _aFernando, I. C. R. | |
| 245 | 1 | 0 | _aAnalysis of dynamic measurements in piles |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1993 |
||
| 300 |
_a124 leaves + _e1 online resource |
||
| 490 | 1 |
_aThesis ; _vno. GT-92-05 |
|
| 500 | _aA thesis study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology | ||
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology, 1993 | ||
| 520 | _aWith the development of modern electronic testing and recording equipment, stress wave measurements on piles became possible. Today, stress wave measurement or the dynamic measurement techniques are used extensively to predict, the pile drivability criteria, the static load capacity, and the stresses generated and any possible damages in piles. This study is the first attempt at AIT to critically evaluate the theory and the practice of two of the most popular dynamic measurement techniques presently being used in Bangkok (CASE and CAPWAPC methods). The static load test data on eighteen piles are concurrently compared with the results from the use of the CAPWAPC program. Also, CASE and CAPW APC analysis on additional seventy-four piles are used to obtain direct correlations between the two methods for a variety of pile types, lengths and tip conditions. Useful correlations are made (to the benefit of practising geotechnical engineers) in predicting the static load capacity from the dynamic test measurements. Also, a method of obtaining the static load settlement curves from CAPWAPC analysis is presented. Finally, additional information regarding damping factors and typical resistance distributions in individual soil layers, and a modified guideline for the CAPW APC user are presented which will reduce the effort and time needed, and to improve the quality of the use of CAPW APC program in dynamic pile testing. | ||
| 650 | 0 |
_aPiling (Civil engineering) _xTesting |
|
| 700 | 1 |
_aBalasubramaniam, A.S., _eChairperson |
|
| 700 | 0 |
_aNoppadol Phien-Wej, _eCo-Chairperson |
|
| 700 | 1 |
_aBergado, Dennes T., _eExamination Committee |
|
| 710 | 2 |
_aFederal Republic of Germany, _eScholarship donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. GT-92-05 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B15559 |
||
| 907 |
_a.b10080971 _bmnait _cs |
||
| 902 | _a240410 | ||
| 998 |
_b2 _c951012 _dm _ea _fs _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c22 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050120712855 _bCREATED : 2014-03-06 _cRECORD # : i12807321 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050120308696 _bCREATED : 2016-05-26 _cRECORD # : i12992951 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c4709 _d4709 |
||