| 000 | 03194nas|a2200397 i 4500 | ||
|---|---|---|---|
| 005 | 20260817162400.0 | ||
| 008 | 220200s1999 th uu m rtt 00| a1eng d | ||
| 035 | _a.b11778386 | ||
| 099 | 9 | _aAIT Thesis no.ET-99-17 | |
| 100 | 1 | _aPham Quang Huy | |
| 245 | 1 | 4 |
_aThe analysis of lightning risk for a 500KV GIS substation : _ba case study in Vietnam |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1999 |
||
| 300 | _a86 leaves | ||
| 490 | 1 |
_aThesis ; _vno. ET-99-17 |
|
| 500 | _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering. School of Environment Resources and Development | ||
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology, 1999 | ||
| 520 | _aThe major problem of insulation level of GIS substation is the overvoltages due to lightning, especially with high value of lightning current. This study concerned with electromagnetic transients to evaluate the failure risk of insulation of equipment. It is more importance because this study is applied for 500kV GIS substation, the new equipment with many advantages of small space requirement, low maintenance cost, low environmental impact, etc. In this study, modeling of the power system and lightning source has been done in the transient state. By using EMTP program, the overvoltages due to lightning have been calculated in various cases of changing lightning current, point of lightning impact, phase angle of power frequency voltage, i.e .. The overvoltage results inside the 500kV GIS are collected for evaluating the risk of failure. A method for estimating the risk of failure of an apparatus as a result of lightning strikes on the transmission lines has been developed to meet the requirements of quick and low-variability calculation. The results shown that with tower footing resistance is 10 ohms· or less, the risk due to lightning can be accepted. Otherwise, the solution to reduce the risk of failure for 500kV GIS substation could be carried out by installing surge anester, reducing tower surge impedance, re-arrange the spans, etc. The calculation can be used efficiently as a calculated process of substation design. | ||
| 650 | 0 |
_aElectric substations _zVietnam |
|
| 650 | 0 |
_aLightning protection _zVietnam |
|
| 700 | 0 |
_aSurapong Chiraratananon, _eChairperson |
|
| 700 | 1 |
_aYu, Cun Yi, _eExamination Committee |
|
| 700 | 1 |
_aDhadbanjan, Thukaram, _eExamination Committee |
|
| 710 | 2 |
_aSida, _eScholarship donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. ET-99-17 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B12781 |
||
| 907 |
_a.b11778386 _bmnait _cu |
||
| 902 | _a240421 | ||
| 998 |
_b0 _c000222 _dm _ea _fu _g4 |
||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c22 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050120731996 _bCREATED : 2014-03-02 _cRECORD # : i12754730 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050120365480 _bCREATED : 2016-06-15 _cRECORD # : i13037067 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c4849 _d4849 |
||