000 03676nam a2200385 4500
005 20260818115019.0
008 290798 th eng
035 _a.b10303406
099 9 _aAIT Thesis no.ST-88-06
100 1 _aChen, Wei-chiang
245 1 0 _aGeneration of weighting factors for evaluating management performance on construction
260 _aBangkok :
_bAsian Institute of Technology,
_c1988
300 _a77, 20 p.
490 1 _aThesis ;
_vno. ST-88-06
500 _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
502 _aThesis (M.Eng.) - Asian Institute of Technology, 1988
520 _aDue to the complexity and competitiveness of construction projects today, "Mechanization of Operations" and " Good Management" are two most potential approaches to win more contract by increasing the productivity. Since mechanization through ROBOTICS has its drawbacks and limitations due to the impact of environmental influences. Therefore good management may be considered to be the most significant potential area for productivity improvement. In this study quantitative system has been developed to assign relative weighting to various factors affecting management performance on construction. Questionnaires were designed to collect empirical data from t h e project managers regarding the influence of various factors on their project and also on the relative weighting of factors against themselves. This data was obtained via direct visits to projects in Hongkong, Korea & Taiwan and by mails from others; From the rank data, we generated the relative weighting of factors for all types of construction, type-oriented construction and country-oriented construction and discussed the significant differences between ranks and weightings, then convert e d rank data into numerical and sorted projects by the job conditions. Finally Linear Discriminant Function (LDF ) analysis has been used to identify the job and management conditions based on different combinations of variables, which were conducted by the correlation analysis , to find out the highest correctness of estimate accompanying with the evaluation index (Z-score ) and the best LDF equation. Thus we can e stablish the performance evaluation models through the assumptions and t he critical Z-scores. Comparing the project Z-score which is generated from LDF equation with the critical values in t h e evaluation mode l, we can assess the " efficiency " of management as good , fair or poor and make timely, proper decisions to correct the deficiencies.
650 0 _aConstruction industry
_xManagement
700 1 _aChauhan, Roshan Lal,
_echairperson
700 1 _aJearkjirm, Vithool,
_eExamination Committee
700 1 _aOsakaya, Yoshiyuki,
_eExamination Committee
710 2 _aRET-SER Engineering Agency , R.O.C.,
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. ST-88-06
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B18628
907 _a.b10303406
_bmnait
_cs
902 _a240402
998 _b2
_c951012
_dm
_ea
_fs
_g0
945 _lmnait
945 _lmnarc
942 _c22
942 _c40
909 _aBarcode : 30050120692537
_bCREATED : 2014-08-04
_cRECORD # : i12787668
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050160011556
_bCREATED : 2016-07-04
_cRECORD # : i1292801x
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c49392
_d49392