| 000 | 02995nas|a2200421 i 4500 | ||
|---|---|---|---|
| 005 | 20260817162420.0 | ||
| 008 | 020228s2001 th u m rtt 00| a1eng d | ||
| 035 | _a.b11847888 | ||
| 099 | 9 | _aAIT Thesis no. ISE-01-07 | |
| 100 | 1 | _aLaurence, Ibarz | |
| 245 | 1 | 0 |
_aAnalysis of quality costs by simulation : _ba case study |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c2001 |
||
| 300 | _a77, [6] p. | ||
| 490 | 1 |
_aThesis ; _vno. ISE-01-07 |
|
| 500 | _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Advanced Technologies | ||
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology, 2001 | ||
| 520 | _aBecause any changes taken for the purpose of quality improvement cost money, it is normal to want an answer to the question: "What will be the effects of that action?" before implementing that change. So, what is required is a tool to investigate the quality performance and the financial implications of changes in equipment, set-up, procedures, ... before they are implemented. This would be an important help in decisions making. A mathematical model can be a tool to predict the economic consequences of the actions the organisation plans to take. But, because a simulation tool can model linear drift of the mean proportion defectives and also sudden shifts of this mean (generated randomly), and because a simulation model is a dynamic system, it is certainly more adequate than the mathematical model. Both models will be studied in this research. After studying the effects of the different actions that can be taken, it will be possible to improve the actual system, and reduce the costs related to poor quality. | ||
| 650 | 1 | 0 |
_aTotal quality management _xSimulation methods |
| 650 | 1 | 0 |
_aQuality control _xCosts |
| 700 | 1 |
_aNagarur, Nagendra N., _eChairperson |
|
| 700 | 1 |
_aAnulark Techanitisawad, _eExamination committee |
|
| 700 | 0 |
_aVoratas Kachitvichyanukul, _eExamination Committee |
|
| 710 | 2 |
_aEuropean Commission (PTS), _eScholarship donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. ISE-01-07 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B08598 |
||
| 907 |
_a.b11847888 _bmnait _cu |
||
| 902 | _a240329 | ||
| 998 |
_b0 _c020228 _dm _ea _fu _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c20 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050120806434 _bCREATED : 2002-02-28 _cRECORD # : i12272528 _dLPATRON : 1018449 _eLCHKIN : 2009-10-14 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 3 _jTOT RENEW : 2 |
||
| 909 |
_aBarcode : 30050120806442 _bCREATED : 2002-02-28 _cRECORD # : i1227253x _dLPATRON : 1018622 _eLCHKIN : 2007-06-27 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 8 _jTOT RENEW : 1 |
||
| 909 |
_aBarcode : 30050120241046 _bCREATED : 2016-02-17 _cRECORD # : i12884273 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c4955 _d4955 |
||