000 03416nas|a2200421 i 4500
005 20260818132045.0
008 181199s1999 th uu m rtt 00| a1eng d
035 _a.b11764922
099 9 _aAIT Thesis no. GE-98-03
100 0 _aPichaya Oungsangkoon
245 1 0 _aGeotechnical aspects in design and construction of Bangkok MRTA blue line initial system
260 _aBangkok :
_bAsian Institute of Technology,
_c1999
300 _a260 leaves
490 1 _aThesis ;
_vno. GE-98-03
500 _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Civil Engineering
502 _aThesis (M.Eng.) - Asian Institute of Technology, 1999
520 _aThis research reviewed geotechnical aspects of underground works related to tunnelling and station construction of the Initial System MRT Project. Properties of subsoil through the tunnel alignment were summarized. Top-down method is performed in station construction. Station walls used diaphragm wall to support the surrounding soils. In tunnel works, eight EPB shields are adopted for excavation of the running tunnels. Tunnel lining consists of five and six regular precast concrete segments. The design method of segmental lining is of the Muir Wood (1975). Consolidation of the clay layer causes differential settlement of the underground structures founded on different foundation depths. The settlement prediction methods are based on the regression of land subsidence data and the consolidation compression/swelling characteristics of the clays. This research summarizes the results of differential settlement prediction that is expected between tunnel connections with other structures founded at a shallower or deeper depth. The evaluation of protection requirement followed damage classification given by Burland ( 1997) and Boscadin and Cording (1989). Pile foundations of canal bridge and overpass bridge obstructing the routes of bored tunnels, are underpinned with new piles. Ground treatment utilized in construction mainly consists of jet grouting in order to control the problems of soft ground.
650 0 _aTunneling
_zThailand
_zBangkok
650 0 _aUnderground construction
700 0 _aNoppadol Phien-Wej,
_eChairperson
700 1 _aBalasubramaniam, A.S.,
_eExamination Committee
700 1 _aDer-Guey, Lin,
_eExamination committee
710 2 _aAsian Institute of Technology Partial Scholarship,
_eScholarship donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. GE-98-03
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B12418
907 _a.b11764922
_bmnait
_cy
902 _a240420
998 _b0
_c991111
_dm
_ea
_fy
_g0
945 _lmnait
945 _lmnait
945 _lmnarc
942 _c20
942 _c40
909 _aBarcode : 30050120717482
_bCREATED : 1998-06-14
_cRECORD # : i12162486
_dLPATRON : 1018825
_eLCHKIN : 2006-06-30
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 13
_jTOT RENEW : 1
909 _aBarcode : 30050120717466
_bCREATED : 1998-06-14
_cRECORD # : i12162498
_dLPATRON : 1029289
_eLCHKIN : 2019-01-10
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 20
_jTOT RENEW : 11
909 _aBarcode : 30050160081252
_bCREATED : 2016-05-17
_cRECORD # : i12980584
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c50356
_d50356