| 000 | 03062nam a2200397 4500 | ||
|---|---|---|---|
| 005 | 20260818132621.0 | ||
| 008 | 120698 th eng | ||
| 035 | _a.b10316747 | ||
| 099 | 9 | _aAIT Thesis no.WA-90-25 | |
| 100 | 1 | _aNobi, Nur | |
| 245 | 1 | 0 | _aGround water management model for a multi-aquifer system |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1990 |
||
| 300 | _a79, A-9, B-35, C-6 p. | ||
| 490 | 1 |
_aThesis ; _vno. WA-90-25 |
|
| 500 | _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology | ||
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology, 1990 | ||
| 520 | _aThe need of a proper management policy for the optimum development of an aquifer systems is widely felt. Specially for the large multi-aquifer system an efficient management technique is needed to cope with dimensionality problem, encountered while incorporating a distributed parameter ground water flow model in a management model. In this study, an efficient numerical technique has been developed to generate the unit response matrix of a multi-aquifer system using the finite difference ADI scheme. An operational management model with economic objective, incorporating both pumping and recharge, has also been developed using the unit response matrix which simulate the flow explicitly. The model has been formulated in the hierarchical approach, decomposing the problems into different levels such that it can be applied to large aquifer system. The solution procedure of the management model is iterative, encompassing both quadratic and linear programming problems. The management model has been applied to the real life problem of Bangkok aquifer system, as a case study. An optimum pumping policy for the system for the next 10 years (1991-2000) has obtained satisfying the minimum pumping requirements and minimum allowable heads at different location. The model has been applied to the Bangkok aquifer system for different conditions in order to evaluate different scenarios. | ||
| 650 | 0 |
_aWater, Underground _xManagement |
|
| 650 | 0 | _aAquifers | |
| 700 | 1 |
_aGupta, Ashim Das, _eChairperson |
|
| 700 | 1 |
_aPaudyal, Guna N., _eCo-Chairperson |
|
| 700 | 1 |
_aHarboe, Ricardo, _eExamination Committee |
|
| 710 | 2 |
_aFINNIDA, _eScholarship Donir |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. WA-90-25 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B18603 |
||
| 907 |
_a.b10316747 _bmnait _cs |
||
| 902 | _a240402 | ||
| 998 |
_b2 _c951012 _dm _ea _fs _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c22 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050120574156 _bCREATED : 2014-03-31 _cRECORD # : i12783079 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050160033774 _bCREATED : 2016-02-15 _cRECORD # : i12881491 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c52098 _d52098 |
||