| 000 | 03668nam a2200433 4500 | ||
|---|---|---|---|
| 005 | 20260818134020.0 | ||
| 008 | 090698 th eng | ||
| 035 | _a.b10342102 | ||
| 099 | 9 | _aAIT Thesis no. WA-89-03 | |
| 100 | 1 | _aGupta, Subhash Chand | |
| 245 | 1 | 0 | _aHydraulic model study of an alternative sediment control system for Nathpa-Jhakri project, India |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1989 |
||
| 300 |
_a110 p. + _e1 online resource |
||
| 490 | 1 |
_aThesis ; _vno. WA-89-3 |
|
| 500 | _aA thesis submitted in partial fulfilment of the requirements for the degree of Master of Engineering | ||
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology, 1989 | ||
| 520 | _aIn the Modified Project Report (1986) of Nathpa-Jhakri hydroelectric project, an underground desilting complex with four parallel chambers, each 350 m x 25 m x 38 m has been proposed. Since this project is located in the Himalayan region consisting of the youngest rocks in the world and geology of this region is unpredictable, provision of suitable desilting arrangement will be of vital importance. It is anticipated that underground construction of these huge chambers, both in respect of span and length would be difficult and costly. Keeping the anticipated construction problems and the associated heavy cost in mind, a desilting arrangement for Nathpa-Jhakri project is proposed in the river itself. The effectiveness of this alternative system has been studied through model studies and the cost comparison of this system to the underground desilting system is also made. A hydraulic scale model of the sediment control system of Nathpa-Jhakri hydroelectric project has been constructed. Experiments have been conducted after reproduction of prototype features in the model with pre-determined sediment concentration with varying design discharges and flushing discharges to determine the efficiency of desilting chamber with hoppers at the bottom. Also, approximate cost of alternative sediment control system is calculated on the basis of analysis of rates, given in the Modified Project Report (1986). The sediment removal efficiency of this system is found up to the desired limit. The cost of this system is estimated to be approximately 24% of the cost of underground desilting arrangement as proposed by Himachal Pradesh State Electricity Board (HPSEB). | ||
| 650 | 0 | _aSediment control | |
| 650 | 0 | _aHydraulic models | |
| 700 | 0 |
_aPreecha Kamronrithisorn, _eChairperson |
|
| 700 | 1 |
_aGupta, Ashim Das, _eCo-Chairperson |
|
| 700 | 1 |
_aChauhan, Roshan Lal, _eExamination committee |
|
| 700 | 1 |
_aPaudyal, Guna N., _eExamination committee |
|
| 710 | 2 |
_aThe Government of the United Kingdom, _eScholarship donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. WA-89-3 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B17842 |
||
| 907 |
_a.b10342102 _bmnait _cs |
||
| 902 | _a240402 | ||
| 998 |
_b2 _c951012 _dm _ea _fs _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c20 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050003053435 _bCREATED : 1994-05-17 _cRECORD # : i10425068 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050003053443 _bCREATED : 1994-05-17 _cRECORD # : i1042507x _dLPATRON : 1012703 _eLCHKIN : 2001-12-23 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 1 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050160034251 _bCREATED : 2016-12-02 _cRECORD # : i12880802 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c56827 _d56827 |
||