000 03668nam a2200433 4500
005 20260818134020.0
008 090698 th eng
035 _a.b10342102
099 9 _aAIT Thesis no. WA-89-03
100 1 _aGupta, Subhash Chand
245 1 0 _aHydraulic model study of an alternative sediment control system for Nathpa-Jhakri project, India
260 _aBangkok :
_bAsian Institute of Technology,
_c1989
300 _a110 p. +
_e1 online resource
490 1 _aThesis ;
_vno. WA-89-3
500 _aA thesis submitted in partial fulfilment of the requirements for the degree of Master of Engineering
502 _aThesis (M.Eng.) - Asian Institute of Technology, 1989
520 _aIn the Modified Project Report (1986) of Nathpa-Jhakri hydroelectric project, an underground desilting complex with four parallel chambers, each 350 m x 25 m x 38 m has been proposed. Since this project is located in the Himalayan region consisting of the youngest rocks in the world and geology of this region is unpredictable, provision of suitable desilting arrangement will be of vital importance. It is anticipated that underground construction of these huge chambers, both in respect of span and length would be difficult and costly. Keeping the anticipated construction problems and the associated heavy cost in mind, a desilting arrangement for Nathpa-Jhakri project is proposed in the river itself. The effectiveness of this alternative system has been studied through model studies and the cost comparison of this system to the underground desilting system is also made. A hydraulic scale model of the sediment control system of Nathpa-Jhakri hydroelectric project has been constructed. Experiments have been conducted after reproduction of prototype features in the model with pre-determined sediment concentration with varying design discharges and flushing discharges to determine the efficiency of desilting chamber with hoppers at the bottom. Also, approximate cost of alternative sediment control system is calculated on the basis of analysis of rates, given in the Modified Project Report (1986). The sediment removal efficiency of this system is found up to the desired limit. The cost of this system is estimated to be approximately 24% of the cost of underground desilting arrangement as proposed by Himachal Pradesh State Electricity Board (HPSEB).
650 0 _aSediment control
650 0 _aHydraulic models
700 0 _aPreecha Kamronrithisorn,
_eChairperson
700 1 _aGupta, Ashim Das,
_eCo-Chairperson
700 1 _aChauhan, Roshan Lal,
_eExamination committee
700 1 _aPaudyal, Guna N.,
_eExamination committee
710 2 _aThe Government of the United Kingdom,
_eScholarship donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. WA-89-3
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B17842
907 _a.b10342102
_bmnait
_cs
902 _a240402
998 _b2
_c951012
_dm
_ea
_fs
_g0
945 _lmnait
945 _lmnait
945 _lmnarc
942 _c20
942 _c40
909 _aBarcode : 30050003053435
_bCREATED : 1994-05-17
_cRECORD # : i10425068
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050003053443
_bCREATED : 1994-05-17
_cRECORD # : i1042507x
_dLPATRON : 1012703
_eLCHKIN : 2001-12-23
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 1
_jTOT RENEW : 0
909 _aBarcode : 30050160034251
_bCREATED : 2016-12-02
_cRECORD # : i12880802
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c56827
_d56827