000 06469nas|a2200409 a 4500
005 20260818134619.0
008 050810s2004 th uu|m rtt 0| a1eng d
035 _a.b11968266
099 9 _aAIT Thesis no.UE-04-12
100 1 _aKumari, Madhumati
245 1 0 _aImproving cost recovery for the betterment of water supply services :
_ba case study of Patna Municipal Corporation (PMC), Bihar, India
260 _aPathum Thani, Thailand :
_bAsian Institute of Technology,
_c2004
300 _a80 leaves
490 1 _aThesis ;
_vno. UE-04-12
500 _aA thesis submitted in partial fulfillment of the requirements for the degree of Masters of Science
502 _aThesis (M.Sc.) - Asian Institute of Technology, 2004
520 _aIn most of the cities of the developing world the water supply service is not meeting the need of growing population. The water supply service is provisioned at highly subsidized rate. The subsidy is, however, never enough to supply water to all residents. This has ironically created a situation in which a large proportion of city residents left without access to water and relatively well-off ones benefiting from the subsidy. In the recent years, the global mood has been changed for water supply to adopt more business approach. This has increased the significance of cost recovery. Cost recovery has so far not been a well-established practice in provisioning water supply. The revenue generation from the public water supply is not sufficient even to meet the operation and maintenance cost of the system. PMC water supply service is also faced with this typical problem. With this in view, the study was undertaken to contribute in improving cost recovery to raise financial base for the betterment of water supply service in Patna city Bihar, India. The present condition of water supply service of PMC such as current water pricing policy, billing and revenue collection efficiency and amount of unbilled water or unaccounted for water, and its challenges for cost recovery have been studied, based on primary and secondary data gathered respectively from interviews and questionnaire survey of PMC officials and households of Patna city and official documents, reports, and newspaper articles, etc. Based on the analysis of these data, factors responsible for poor cost recovery of PMC water supply service have been identified and analyzed in the current context to recommend measures to improve the cost recovery for the betterment of the water supply service in Patna. The key findings of this study include that PMC water supply service covers about 62% of the households in Patna city spread in 112 km2 with the help of 930 km of supply pipe network and 85 pump stations which directly pumps about 398 million liter per day ground water into the supply network to actually deliver about 192 million liter of water to the households. About 530 km out of total 930 km of supply line is badly damaged and needs urgent replacement. The supply water is slightly colored and smelly with trace of suspension in many areas due to contamination from sewerage/drainage or mud through leakage during supply, which causes water born diseases in about 17-20% of the people yearly. The water supply service of PMC has always been in deficit with current shortfall of Rs. 20 million. It can't recover even the operation and maintenance cost from water charge and it has to depend on government aids and loans for its survival. The current water charge is highly subsidized by government at Rs. 30/month/HH for a house with concrete roof on principal main road, which is about one third of the cost based price of water. At present, about 3 8.3% of total annual water billed is uncollected. Also, more than 50% of produced water remains unbilled as unaccounted for water (UFW). Above facts show lack of business approach and affect cost recovery of water supply service negatively. The water price structure should be revised to accommodate production and supply maintenance cost considering A&WTP in the range of Rs. 50 - 200 per month per household in such a way that the average water charge should be more than Rs. 86 per month per household and Rs. 1000 - 2000 for connection fee as per the result of A&WTP study to meet social objectives. Households' WTP for connection fee should be increased by disseminating information about the need of sustainable and quality water supply service. The billing and collection efficiency can be improved by sending correct and timely water bill per month separate from property tax and opening revenue collection counter at local (ward) level. Lease out system can be an alternative for improving billing and revenue collection efficiency. The UFW can be minimized by replacing obsolete pipelines of 530 km, legalizing illegal connections and regular repair and maintenance of water supply system. Also, installation of leak detection system and converting nonmetered to metered supply to minimize the UFW should be considered by PMC as an option if it is cost effective. To realize the above recommendations, PMC needs to be given more autonomy to be more business-oriented organization in order to improve cost recovery for the betterment of water supply service.
650 0 _aWater-supply
_xPrices
_zIndia
700 1 _aAmin, A.T.M. Nurul,
_eChairperson
700 1 _aSajor, Edsel E.,
_eExamination Committee
700 0 _aThammarat Koottatep,
_eExamination Committee
710 2 _aThe Government of Netherlands,
_eScholarship donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. UE-04-12
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B09044
907 _a.b11968266
_bmnait
_cu
902 _a240329
998 _b0
_c050810
_dm
_ea
_fu
_g0
945 _lmnait
945 _lmnait
945 _lmnarc
942 _c20
942 _c40
909 _aBarcode : 30050120801989
_bCREATED : 2005-05-08
_cRECORD # : i12455349
_dLPATRON : 1023807
_eLCHKIN : 2013-06-20
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 6
_jTOT RENEW : 15
909 _aBarcode : 30050120801955
_bCREATED : 2005-05-08
_cRECORD # : i12455350
_dLPATRON : 1020342
_eLCHKIN : 2009-05-25
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 7
_jTOT RENEW : 3
909 _aBarcode : 30050160020300
_bCREATED : 2016-01-20
_cRECORD # : i12871321
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c58820
_d58820