000 02264nam a2200397 4500
005 20260818143528.0
008 040898 th eng
035 _a.b10075331
099 9 _aAIT Thesis no.ST-85-33
100 1 _aYuh, Cherng
245 1 3 _aAn integrated project management control system
260 _aBangkok :
_bAsian Institute of Technology,
_c1985
300 _a179 p.
490 1 _aThesis ;
_vno. ST-85-33
500 _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
502 _aThesis (M.Eng.) - Asian Institute of Technology, 1985
520 _aIn this study, the construction management tasks of project planning, scheduling, and controlling are discussed. A BASIC Micro-Computer program group for project schedule and control is also developed. Attention is concentrated on the project control system, based upon the Critical Path Method (activity of arrow) as the research topic. Data and relevant information of a building construction project were collected. The proposed integrated project management program is tested, and proves to be a very useful method for project management.
650 0 _aElectronic data processing
_xConstruction industry
650 0 _aConstruction industry
_xManagement
700 0 _aPichai Nimityongskul,
_eChairperson
700 0 _aPing Kunawatsatit,
_eCo-Chairperson
700 1 _aCarmichael, D.G.,
_eExamination Committee
710 2 _aRepublic of China (RSEA),
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. ST-85-33
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B20126
907 _a.b10075331
_bmnait
_cs
902 _a240410
998 _b2
_c951012
_dm
_ea
_fs
_g3
945 _lmnait
945 _lmnarc
942 _c22
942 _c40
909 _aBarcode : 30050120687396
_bCREATED : 2014-04-21
_cRECORD # : i12789975
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050160012364
_bCREATED : 2016-05-04
_cRECORD # : i12925974
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c61513
_d61513