000 04046cam a2200421 i 4500
005 20260817162832.0
008 251198s1991 th r 0000|00eng d
008 251198s1991 th r 0000|00eng d
035 _a.b10087370
099 9 _aAIT Thesis no. GT-90-29
100 0 _aSourasay Phoumavong
245 1 0 _aApplication of an updating technique to obtain an O-D matrix for Vientiane, Laos
260 _aBangkok :
_bAsian Institute of Technology,
_c1991
300 _a56 p.
490 1 _aThesis ;
_vno. GT-90-29
500 _aA thesis submitted in partial fulfillment of Requirement for the Degree in Master of Engineering, School of Engineering and Technology
502 _aThesis (M.Eng.) - Asian Institute of Technology, 1991
520 _aIn transportation and landuse planning , the traffic demand and travel pattern in certain areas can usually be predicted using an 0-D matrix. Many models have been developed to estimate an 0-D matrix, however , unfortunately , these models cannot be applied in many developing countries, due to their financial constraints, since these models require enormous surveys and could be very expensive. Therefore, it becomes necessary to seek a possible way to develop a model that estimates an 0-D matrix without requiring extensive surveys. Recently, a Combined Incremental Distribution Assignment · (CIDA ) model was developed that enables a feed back process between trip distribution and trip assignment to improve the existing O-D matrix. The main purpose of this model is to update an existing trip matrix using the available data. It was shown that t h is model is applicable to update an existing 0-D matrix. However, it was strongly recommended to carry o u t a validating of the model with real data, because artificial data have been applied in that research. This study attempts to get an 0-D matrix for Vientiane, Laos, updating the CIDA model and using real data from the actual study area. Due to a lack of an existing 0-D matrix in developing countries like Vientiane, the CIDA model is adopted to obtain a new model using the trip generation through gravity model to get an initial O-D matrix. Using the mean of difference between the estimated and observed traffic volumes the rate of accuracy was analyzed from the present given road network. The limited condition of the high variation ± 10 percent for the comparison between estimated and observed traffic volumes on links showed inefficient results by iterations for the model because of the inadequate traffic count data. However , some links can reach this condition between estimated and observed traffic volumes. Although the results showed an unstable model, it could serve as a theoretical basis for further research.
650 0 _aTraffic engineering
_xLaos
_xVientiane
_xMathematical models
700 1 _aFukuda, Atsushi,
_eChairperson
700 0 _aYordphol Tanaboriboon,
_eExamination Committee
700 1 _aMori, Hiroshi,
_eExamination Committee
710 2 _aThe Swedish International Development Authority (SIDA ),
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. GT-90-29
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B17564
907 _a.b10087370
_bmnait
_cs
902 _a240410
998 _b2
_c951012
_dm
_ea
_fs
_g0
945 _lmnait
945 _lmnait
945 _lmnarc
942 _c20
942 _c40
909 _aBarcode : 30050120712178
_bCREATED : 1995-10-13
_cRECORD # : i10092687
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050003017208
_bCREATED : 1995-10-13
_cRECORD # : i10092699
_dLPATRON : 1014919
_eLCHKIN : 2003-07-28
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 1
_jTOT RENEW : 1
909 _aBarcode : 30050120309215
_bCREATED : 2016-05-25
_cRECORD # : i12991247
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c6468
_d6468