| 000 | 03589nam a2200445 4500 | ||
|---|---|---|---|
| 005 | 20260818144448.0 | ||
| 008 | 240698 th eng | ||
| 035 | _a.b10382379 | ||
| 099 | 9 | _aAIT Thesis no. IE-88-25 | |
| 100 | 1 | _aUdugama, P. K. B. A. | |
| 245 | 1 | 0 | _aIrrigation-energy tradeoff in water management of the Mahaweli River Basin, Sri Lanka |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1988 |
||
| 300 | _a94 p. | ||
| 490 | 1 |
_aThesis ; _vno. IE-88-25 |
|
| 500 | _aA thesis summitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology | ||
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology, 1988 | ||
| 520 | _aThis study presents an evaluation of economic benefits from irrigation and energy generation in the Mahaweli River Basin, Sri Lanka which consists of number of multipurpose reservoirs. The Mahaweli Development Project has been established to meet two main objectives, namely water supply for irrigation and hydroenergy generation . This analysis presents how the water can be best used between these two objectives. At the first stage of the analysis irrigation demands in the system were completely relaxed and then by imposing irrigation demands into the system by little degrees the performances of the system was observed in monetary terms. Depending on these observations minimum loss operation condition was found. Deterministic inflow data occurred in the past were used for the analysis. Data of three different kinds of years, namely dry year, wet year and average year were used. Mainly two mathematical models were developed in this study . They are IDP model for energy maximization from the power plants and GP model for supplying water for irrigation. The GP model was divided into two stages in order to determine final outcome from irrigation. Simplified configurations were used in solving both IDP and GP models. Rule curves for reservoirs in irrigation areas have also been developed as a result of this study. Analysis was performed for both 3-year and 1-year time horizons. | ||
| 650 | 0 | _aMahaweli Development Project | |
| 650 | 0 |
_aHydroelectric power plants _xSri Lanka |
|
| 700 | 1 |
_aTabucanon, Mario T., _eChairperson |
|
| 700 | 1 |
_aFujiwara, Okitsugu, _eExamination Committee |
|
| 700 | 1 |
_aBogardi, Janos J., _eExamination Committee |
|
| 710 | 2 |
_aThe Royal Government of Belgium, _eScholarship Donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. IE-88-25 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B18749 |
||
| 907 |
_a.b10382379 _bmnait _cs |
||
| 902 | _a250625 | ||
| 998 |
_b3 _c951012 _dm _ea _fs _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 945 | _lmnarc | ||
| 942 | _c20 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050003072476 _bCREATED : 1995-10-14 _cRECORD # : i10478036 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050003072484 _bCREATED : 1995-10-14 _cRECORD # : i10478048 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050003072492 _bCREATED : 1995-10-14 _cRECORD # : i1047805x _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050160010160 _bCREATED : 2016-04-19 _cRECORD # : i12938373 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c65196 _d65196 |
||