000 04025nas|a2200409 i 4500
005 20260817162854.0
008 230399s1998 th uzm rtt 00| a1eng d
035 _a.b11742471
099 9 _aAIT Thesis no. ET-98-30
100 0 _aNaruchit Meepadung
245 1 4 _aThe application of energy conservation using a building automation system :
_ba case study of an office building
260 _aBangkok :
_bAsian Institute of Technology,
_c1998
300 _a44, [42] leaves
490 1 _aThesis ;
_vno. ET-98-30
500 _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Environment, Resources and Development
502 _aThesis (M.Eng.) - Asian Institute of Technology, 1998
520 _aBuilding Automation Systems are designed to integrate building systems, such as HV AC, lighting, fire safety, and security access control. The integration of all of these systems can reduce initial and ongoing costs, and simplify building operation. the energy consumption and cost in large office buildings can be reduced by allowing the indoor environment to deviate from the optimum comfort conditions to situations which are still acceptable by most occupants. This study investigates the potential of energy saving in HV AC system of an office building when BAS is used. The potential of the power management from usage in term of reduction of peak demand from cost saving is also evaluated, the financial viability of BAS installation does. A study building is a sample of office building using BAS to control the operation effectively in the building to reach the energy conservation goal. To control the state of AJC operation, the BAS can provide a criterion to control the active status as following details through the DDC unit. This two step control uses two-position temperature value in the data comparison. For example, if the setpoint is 26 and a differential is four, the measured temperature must rise above 28 degrees before the module controls an HV AC unit on (space is too warm). The temperature must fall below 24 before the point controls an HVAC unit off (space is too cool). This creates a control range of 24 to 28 degrees. The temperature from the RI A is not exactly representative value of the working space that we want to do a thermal comfort. For example, the RI A temperature that measured from inside the area is set to be 23 ° C by BAS program but mechanical design from this building, the VA V boxes can not work correctly there is some losses as ventilating. an average temperature from each zone representing the thermal comfort of the PCUs are not satisfy the thermal comfort according to ASHRAE Fundamental 1997 which states that the suitable comfort condition should be 25. 5 ° C.
650 0 _aBuildings
_xEnergy conservation
650 0 _aEnergy conservation
_xAutomation
700 0 _aSurapong Chiraratananon,
_eChairperson
700 1 _aMalik, Saeed Arif,
_eExamination committee
700 1 _aBundit Limmeechokchai,
_eExamination committee
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. ET-98-30
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B13331
907 _a.b11742471
_bmnait
_cy
902 _a240411
998 _b0
_c990323
_dm
_ea
_fy
_g4
945 _lmnait
945 _lmnait
945 _lmnarc
942 _c20
942 _c40
909 _aBarcode : 30050120708044
_bCREATED : 1997-10-24
_cRECORD # : i1212462x
_dLPATRON : 1015423
_eLCHKIN : 2002-02-06
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 2
_jTOT RENEW : 0
909 _aBarcode : 30050120708051
_bCREATED : 1997-10-24
_cRECORD # : i12124631
_dLPATRON : 1020696
_eLCHKIN : 2008-04-28
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 9
_jTOT RENEW : 4
909 _aBarcode : 30050120365738
_bCREATED : 2016-06-15
_cRECORD # : i13036622
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c6575
_d6575