| 000 | 03161nam a2200385 4500 | ||
|---|---|---|---|
| 005 | 20260817162856.0 | ||
| 008 | 120698 th eng | ||
| 035 | _a.b10087813 | ||
| 099 | 9 | _aAIT Thesis no.WA-90-26 | |
| 100 | 0 | _aParaat Punyindu | |
| 245 | 1 | 0 | _aApplication of flood forecasting model on the U-Thaphao Basin, Southern Thailand |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1990 |
||
| 300 | _a57 p. | ||
| 490 | 1 |
_aThesis ; _vno. WA-90-26 |
|
| 500 | _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology | ||
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology, 1990 | ||
| 520 | _aSouthern Thailand has been subjected to intense rainfall and wide spread flooding at least once in every two years. Especially, the catastrophic flood during the third week of November 1988 caused server loss of life and damage to property in the area. Flood damage could be alleviated by flood forecasting warning. An attempt has been done to forecast the flood in U-Thaphao basin, southern Thailand, using a preliminary version of the MIKE-11 package. Three models of the MIKE-11 has been used in this study. The simulated run-off from NAM model has been used as lateral inflow into the hydrodynamic (HD) model. The simulated discharges by NAM model matched with observed discharges having almost no phase error but with some amplitude error within acceptable limit. The hydrodynamic (HD) model simulates water levels and discharges at all computational nodes which has been used as an initial condition into flood forecasting (FF) model. A gook matching between observed and simulated discharge has been observed. The flood Forecasting (FF) model with the updating facility for the adjustment of the phase and amplitude error has been used for flood forecasting. The 1988 flood data of Hat Yai subcatehment, Thailand have been used to test the FF model. It is found that the forecasted flood for the first day of the rising limb of the flood peak showed good matching with the observed data but for the other days there is quite appreciable error in phase as well as amplitude. | ||
| 650 | 0 |
_aFlood forecasting _xThailand, Southern |
|
| 700 | 0 |
_aSuphat Vongvisessomjai, _eChairperson |
|
| 700 | 1 |
_aJensen, Niels Einar, _eExamintion Committee |
|
| 700 | 1 |
_aHarboe, Ricardo, _eExamination Committee |
|
| 710 | 2 |
_aCIDA, _eScholarship Donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. WA-90-26 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B18604 |
||
| 907 |
_a.b10087813 _bmnait _cs |
||
| 902 | _a240410 | ||
| 998 |
_b2 _c951012 _dm _ea _fs _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c22 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050120574123 _bCREATED : 2014-02-04 _cRECORD # : i12785131 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050160033758 _bCREATED : 2016-02-15 _cRECORD # : i1288151x _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c6590 _d6590 |
||