000 03492nas|a2200469 i 4500
005 20260817162917.0
008 121095s1985 th uu m rtt 00| a eng d
035 _a.b10088258
099 9 _aAIT RSPR no. IE-85-10
100 1 _aLee, Hsien
245 1 0 _aApplication of material requirements planning in a workshop of construction company
260 _aBangkok :
_bAsian Institute of Technology,
_c1985
300 _a42, I-1 p.
490 1 _aResearch studies project report ;
_vno. IE-85-10
500 _aA research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
502 _aResearch Studies Project Report (M. Eng.) - Asian Institute of Technology, 1985
520 _aThe material requirements planning system is used extensively with planned production. It is suitable for items which have a derived demand. For items that are materials or components used for end items, stock levels are derived from the requirements dictated by end item. It is a derived order quantity system. A workshop of construction company is responsible to maintain the regular operation of the equipment . The preventive maintenance of equipment required amount of various parts. The shortage of parts caused the shutdown of the equipment, excessive inventory incurred more carrying cost. So the MRP system was considered to solve the problem. The study deals with the adaption and implementation of the MRP model to the maintenance job of the workshop . Data from the part requirements of 5 models of equipment, each with 4 types of maintenance were analyzed. A new lot sizing technique was developed for more efficient to saving the computation. The results indicated that the MRP approach could help in solving the problems.
650 0 _aMaterials management
700 1 _aLu, Iuan-Yuan,
_eChairpeson
700 1 _aVrat, Prem,
_eExamination Committee
700 1 _aFujiwara, Okitsugu,
_eExamination Committee
700 1 _aSaeed, Khalid,
_eExamination Committee
710 2 _aGovernment of the Republic of China,
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tResearch studies project report ;
_vno. IE-85-10
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B19883
907 _a.b10088258
_bmnait
_cy
902 _a240410
998 _b3
_c951012
_dm
_ea
_fy
_g0
945 _lmnait
945 _lmnait
945 _lmnarc
945 _lmnarc
945 _lmnarc
942 _c20
942 _c40
909 _aBarcode : 30050003110532
_bCREATED : 1995-10-13
_cRECORD # : i10094039
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050120724389
_bCREATED : 1995-10-13
_cRECORD # : i10094040
_dLPATRON : 1009341
_eLCHKIN : 1999-02-26
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 1
_jTOT RENEW : 0
909 _aBarcode : 30050003110516
_bCREATED : 1995-10-13
_cRECORD # : i10094052
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050003110508
_bCREATED : 1996-11-06
_cRECORD # : i11779974
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050160109798
_bCREATED : 2016-08-04
_cRECORD # : i12932589
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c6692
_d6692