100 0 _aPrerasak Srigungvarl
245 1 2 _aA knowledge-based integrated system for line-of-balance applications in high-rise building construction
260 _aBangkok :
_bAsian Institute of Technology,
_c1992
300 _a225, 161 leaves
490 1 _aDissertation ;
_vno. ST-92-02
500 _aA dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Engineering, School of Engineering and Technology
502 _aThesis (Ph.D.) - Asian Institute of Technology, 1992
520 _aIn this study, a knowledge-based integrated system to schedule high-rise building construction, is developed by using the Line-of-Balance technology assisted by an expert system. Reviewing the recent literature on the techniques available for scheduling and controlling construction projects of repetitive nature, it is found that bar charts are inadequate and that there are serious problems with using network methods in such circumstances. There is evidence that the construction of high-rise building has a highly repetitive nature but differs in some respects from other repetitive projects such as pipelines or pavement construction. Four new concepts have been introduced into line-of-balance methodology to accommodate the special condition encountered in high-rise building construction. These concepts are "Flexible Unit Network" concept and three concepts on "Multi-Level LOB Diagram". This information has been programmed into a scheduling module (LOBPLANS) . A series of databases have been compiled regarding the productivity of resources. An expert system (LOBEX) has been developed to facilitate decision making at network generation level. The scheduling module, the databases, and the expert system have been organized into an integrated system (CHRISS} by means of communication and command routines that interface between the modules and user input. A 16-storey building project has been used in testing CHRISS' performance. The integrated system proved to be a user-friendly, reliable, and valuable software that can assist a user in preparing data and generating network schedules for high-rise building construction.
650 0 _aTall buildings
650 0 _aExpert systems (Computer science)
700 0 _aWorsak Kanok-Nukulchai,
_eChairperson
700 1 _aArditi, David,
_eCo-Chairperson
700 1 _aOgunlana, Stephen O.,
_eExamination Committee
700 1 _aHuynh, Ngoc Phien,
_eExamination Committee
700 0 _aPrapon Phasukyud,
_eExamination Committee
700 1 _aRowlinson, Steve,
_eExamination Committee
810 2 _aAsian Institute of Technology.
_tDissertation ;
_vno. ST-92-02
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B16779
907 _a.b11518340
_bmnait
_ct
902 _a240405
998 _b0
_c960705
_dm
_ea
_ft
_g2
945 _lmnait
945 _lmnait
945 _lmnarc
942 _c20
942 _c40
909 _aBarcode : 30050003059556
_bCREATED : 1996-05-07
_cRECORD # : i11795177
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050003059564
_bCREATED : 1996-05-07
_cRECORD # : i11795189
_dLPATRON : 1017209
_eLCHKIN : 2006-09-05
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 8
_jTOT RENEW : 3
909 _aBarcode : 30050120235477
_bCREATED : 2016-03-29
_cRECORD # : i1291048x
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c67350
_d67350