000 03927nam a2200385 4500
005 20260817163004.0
008 250698 th eng
035 _a.b10089482
099 9 _aAIT Thesis no.IE-90-3
100 1 _aArshad, Muhammad
245 1 0 _aApplication of value engineering techniques in the light engineering industry
260 _aBangkok :
_bAsian Institute of Technology,
_c1990
300 _a136 p.
490 1 _aThesis ;
_vno. IE-90-3
500 _aA thesis submitted in partial fulfillment of requirements for the degree of Master of Engineering, School of Engineering and Technology
502 _aThesis (M.Eng.) - Asian Institute of Technology, 1990
520 _aThis study involves a· systematic approach for the identification of poor value areas in a door lock manufacturing plant and suggests the better value alternatives through the application of Value Engineering techniques. Because of specific nature of the problems considered in this study, three different Value Engineering job plans, i.e., DARSIRI Job Plan, Mudge' s Job Plan and VE Standard Five Phase Job Plan have been used for value improvement. I DARSIRI Job Plan is used· for the reduction of scrap generated at various production stages particularly at Power Washer and Spray Bake. Mudge's Job Plan is used for material conservation through the revision of design specifications of poor value items. The Standard Five Phase Job Plan is used for packaging modification in order to reduce the freight charges per unit. Along with other Value Engineering techniques used in various phases of job plans, Analytic Hierarchy Process (AHP) technique is used for the evaluation of various alternatives obtained during the creation phase and selecting the best alternative on the basis of different criteria. This study also includes the findings of the application of Value Engineering job plans in the aforementioned areas. The scrap produced at Power Washer and Spray Bake has been reduced by more than 80% and thus US$ 944.25 per month can be saved due to scrap reduction. Through the systematic approach suggested by Mudge, a saving of US$ 730.4 per month has been estimated in the material cost of Rose T-Turn Auxiliary of Inner Trim Assembly for DC 9470 lockset and thus the value of this part is increased by 28%. Moreover a saving of JJS$ 144 per month can also be achieved due to scrap reduction at Power washer in Rose T-Turn. Freight charges can be reduced by 24% through the 10% reduction of the width of box pack and the modification of the existing stacking geometry of the cases ~nd pallets. Hence a cumulative saving of more than 2 million baht annually has been achieved through this study. The savings potential indicated by these studies confirms that as a management technique, Value Engineering is an important productivity improvement tool which can be exploited in the manufacturing industry.
650 0 _aValue analysis (Cost control)
700 1 _aVrat, Prem,
_eChairperson
700 1 _aTabucanon, Mario T.,
_eExamination Committee
700 1 _aOudheusden, Dirk L. van,
_eExamination Committee
710 2 _aThe Government of Netherland,
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. IE-90-3
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B18477
907 _a.b10089482
_bmnait
_cs
902 _a240411
998 _b2
_c951012
_dm
_ea
_fs
_g0
945 _lmnait
945 _lmnarc
942 _c22
942 _c40
909 _aBarcode : 30050120821565
_bCREATED : 2014-03-19
_cRECORD # : i12773220
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050160076260
_bCREATED : 2016-04-20
_cRECORD # : i1294032x
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c6935
_d6935