| 000 | 04455cas|a2200397 a 4500 | ||
|---|---|---|---|
| 005 | 20260817163007.0 | ||
| 008 | 020125s2001 th uu|m rtt 0| a1eng d | ||
| 035 | _a.b1184288x | ||
| 099 | 9 | _aAIT Thesis no.EV-01-11 | |
| 100 | 0 | _aMyo Min Cho | |
| 245 | 1 | 0 | _aApplication of yeast membrane bioreactors for saline wastewater treatment |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c2001 |
||
| 300 | _a61 leaves | ||
| 490 | 1 |
_aThesis ; _vno. EV-01-11 |
|
| 500 | _aA thesis submitted in pa1iial fulfillment of the requirement for the degree of Master of Engineering, School of Environment, Resources and Development | ||
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology, 2001 | ||
| 520 | _aYeast system coupled with microfiltration membrane, also called yeast membrane bioreactor, and is a promising technology used as pretreatment of biodegradable organic matter from saline seafood wastewater prior to secondary treatment for high organic strength wastewater and as secondary and advanced treatment for low organic strength wastewater. The experimental investigations were conducted by using lab-scale experiments, which were separated into five stages. In the first stage, biokinetic constant experiments were conducted in order to determine the growth rate of yeast sludge. The effects of different salt concentrations on growth rate were studied in this stage. It was concluded that growth rate of yeast mixture at high salt concentrations (32 and 45 g/L) was higher than that of activated sludge. In the second stage, the batch experiments were conducted in order to determine the optimum operating condition for yeast membrane bioreactor. The effects of different sludge retention time and nutrient loading were studied in this stage. The results showed that yeast reactor run at SRT of 10 d, influent COD of 5000 mg/L could obtained around 80% COD removal. Main mechanism of nitrogen removal in yeast reactor is nitrogen uptake process into biomass. However, precipitation of protein at low pH which is adjusted to 3.5 to 3.8 for yeast growth and inhibition of bacteria contamination may attribute to nitrogen removal. In the third stage, the continuous YMBR experiment was conducted in order to determine the optimum hydraulic retention time. The results show that the YMBR run at HRT of 24 h with influent COD concentration of 5000 mg/L could remove 85% of COD. Moreover, membrane bioreactor run at HRT of 8 h with influent COD concentration of 1000 mg/L could achieve effluent COD quality met the effluent standard set in Thailand after neutralization. In the fourth stage, membrane-clogging experiment was conducted. From the experimental results, it was concluded that yeast system could prolong the operation period of membrane without chemical cleaning than that of bacteria system. In the fifth stage, characteristics of sludge with different salt concentration were determined on the dewaterability of the sludge. It can be concluded wide yeasts acclimatized in this study has poor settling ability, but inversely it has good dewatering ability. Therefore using membrane technique for yeast treatment could overcome this disadvantage and as well as obtain high effectiveness for dewatering, increasing membrane performance and running with low pump pressure | ||
| 650 | 0 |
_aSewage _xPurification _xBiological treatment |
|
| 700 | 1 |
_aVisvanathan, C., _eChairperson |
|
| 700 | 1 |
_aTrankler, Josef, _eExamination Committee |
|
| 700 | 1 |
_aFukushi, Kensuke, _eExamination Committee |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis; _vno. EV-01-11 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B08211 |
||
| 907 |
_a.b1184288x _bmnait _cu |
||
| 902 | _a240329 | ||
| 998 |
_b0 _c020125 _dm _ea _fu _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c20 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050120652275 _bCREATED : 2000-08-28 _cRECORD # : i12267880 _dLPATRON : 1024926 _eLCHKIN : 2013-10-10 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 8 _jTOT RENEW : 1 |
||
| 909 |
_aBarcode : 30050120652267 _bCREATED : 2000-08-28 _cRECORD # : i12267892 _dLPATRON : 1018242 _eLCHKIN : 2005-03-22 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 1 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050160077060 _bCREATED : 2016-05-24 _cRECORD # : i12989484 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c6950 _d6950 |
||