000 04715nam a2200409 4500
005 20260818153916.0
008 180698 th eng
035 _a.b11533869
099 9 _aAIT Thesis no. TE-95-05
100 0 _aKunzang Wangdi
245 1 0 _aMaintenance strategy of the East-West Highway :
_ba case study of Bhutan
260 _aBangkok :
_bAsian Institute of Technology,
_c1996
300 _a93 leaves
490 1 _aThesis ;
_vno. TE-95-05
500 _aA thesis submitted in partial fulfillment of the requirement for the Degree of Master of Engineering, School of Civil Engineering
502 _aThesis (M.Eng.) - Asian Institute of Technology, 1996
520 _aMost of Bhutan's road network comprising of more than 3000 km of highways, district and feeder roads is deteriorating at a much faster pace than it can be repaired. Lack of experience in road maintenance and shortage of funds further contributes to increased deterioration. The East-West Highway in particular has suffered considerable deterioration since its construction in the early eighties. Indeed, the tasks of road construction and maintenance are difficult owing to Bhutan's rugged mountainous terrain. At present maintenance needs are decided largely on the basis of past experience rather than on a systematic needs appraisal. The lack of a rational system for pavement evaluation has made PWD rely heavily on past experiences in deciding the maintenance needs. This study presents a method for evaluation of pavement condition based on Pavement Condition Index procedure with particular reference to the maintenance of the East-West Highway. Detailed pavement distress data on the highway stretch between Semtokha to Nobding covering a distance of 95 Km were collected using visual method. For the purpose of analyses this highway section was grouped into two categories depending on the existing surface types. The first group contained 82 pavement sections with premix surface dressing application and the second group comprised of 13 sections with surface dressing application. The pavement condition index (PCI) for each section was determined using the "deduct value" approach. The deduct value represents the amount of deterioration suffered by each designated pavement section. Regression analyses were conducted to establish the pavement deterioration parameters for premix surfacing and surface dressing applications. Adopting the PCI terminal value of 60 as the service life the service life of the premix surface application was found to be 8 years whereas that for surface treatment application was about 6 years. The annual maintenance cost for premix surface pavement was found to be lower than that for surface treatment pavement, implying that in the long run premix surface application is cheaper. A matrix of maintenance costs for various PCI ranges was developed from the maintenance unit costs and the surface density matrix. A fiercest of future maintenance funds requirement was made for a five year planning period (1996-2000) by predicting the pavement condition index in the succeeding years of the planning horizon. An attempt was made to compare the cracking predicted by the PCI method and the cracking progression simulated by HDM-111. The cracking progression simulated by HOM-III was found to be significantly higher than that predicted by the PCI method. However this is a subject of further research.
650 1 0 _aRoads
_xBhutan
_xMaintenance and repair
700 1 _aChen, Jian-Shiuh,
_eChairperson
700 1 _aMorisugi, Hisa,
_eExamination committee
700 1 _aBergado, Dennes T.,
_eExamination Committee
710 2 _aBhutan-Netherlands Bilateral Sustainable Development Project,
_eScholarship donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. TE-95-05
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B15009
907 _a.b11533869
_bmnait
_cs
902 _a240329
998 _b0
_c960924
_dm
_ea
_fs
_g0
945 _lmnait
945 _lmnait
945 _lmnarc
942 _c20
942 _c40
909 _aBarcode : 30050120817472
_bCREATED : 1996-09-24
_cRECORD # : i11840729
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050120817381
_bCREATED : 1996-09-24
_cRECORD # : i11840730
_dLPATRON : 1020171
_eLCHKIN : 2010-02-16
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 20
_jTOT RENEW : 4
909 _aBarcode : 30050160014865
_bCREATED : 2016-03-22
_cRECORD # : i12901751
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c71290
_d71290