| 000 | 03290nas|a2200385 i 4500 | ||
|---|---|---|---|
| 005 | 20260818154526.0 | ||
| 008 | 121095s1981 th uu m rtt 00| a1eng d | ||
| 035 | _a.b10425573 | ||
| 099 | 9 | _aAIT SSPR no. CA-81-5 | |
| 100 | 1 | _aIyer, Ramanan B. | |
| 245 | 1 | 0 | _aMaterial requirements planning for a sanitaryware manufacturing company |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1981 |
||
| 300 | _a1 v. (various pagings) | ||
| 490 | 1 |
_aSpecial studies project report ; _vno. CA-81-5 |
|
| 500 | _aA special study submitted in partial fulfilment of the requirements for the degree of Master of Engineering, School of Engineering and Technology | ||
| 502 | _aSpecial Studies Project Report (M. Eng.) - Asian Institute of Technology, 1981 | ||
| 520 | _aThis study is carried out with the main objective of developing a system to improve the material planning function of the sanitary ware manufacturing company. Presently, ASTL is following an intuitive approach to plan the material. The problem with the present system is that the company is overstocking the materials required for a minimum period of three months. This is due to the tact t hat the company is not able to schedule the orders when the materials are required. Another problem is, placing rush orders which~ means increased cost. For these reasons, the company should adopt an inventory control technique . The document flow of manual system is given in Appendix c. The major requirements of the raw materials collie from Mold shop, Slip house, and Glaze room. The exact requirements of the raw materials are computed from the end-product production schedule which is subjected to local and foreign demand. The company is operating on a make-to-order basis. The demand for the products varies from period to period so that a system, which replaces the averaging process (based on historical systems) that use statistical techniques for ordering materials independent of their relationship to the end product is needed. MRP has unique characteristics which include planning and control of demands based on dependent future requirements, rather than historical averages. Finally, the working of the MRP system and the necessary measures t o implement the system successfully are cited. | ||
| 650 | 0 |
_aSanitary supply industry _xThailand _xInventory control |
|
| 700 | 0 |
_aKrisorn Jittorntrum, _eChairperson |
|
| 700 | 1 |
_aGupta, Gopal K., _eExamination Committee |
|
| 700 | 1 |
_aHovde, Per, _eExamination Committee |
|
| 710 | 2 |
_aNORAD , Norway, _eScholarship Donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tSpecial studies project report ; _vno. CA-81-5 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B21465 |
||
| 907 |
_a.b10425573 _bmnait _cy |
||
| 902 | _a241211 | ||
| 998 |
_b2 _c951012 _dm _ea _fy _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c22 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050120567390 _bCREATED : 2013-05-07 _cRECORD # : i12733969 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 1 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050120345086 _bCREATED : 2016-06-15 _cRECORD # : i13039283 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c73728 _d73728 |
||