000 10622cam a2200313Ia 4500
005 20260818155833.0
008 121010s2010 vraa ob 101 0 eng d
020 _a9781621981077
020 _a162198107X
035 _a.b12257552
111 2 _aInternational Symposium on Mine Planning and Equipment Selection
_d(2010 :
_cFremantle, W.A.)
245 1 0 _aMPES 2010 :
_bMine Planning & Equipment Selection : proceedings /
_cedited by E. Topal and M. Kuruppu.
246 1 0 _aMine Planning and Equipment Selection :
_bproceedings
246 1 0 _aProceedings of the International Symposium on Mine Planning and Equipment Selection 2010
260 _aCarlton South, Vic. :
_bAusIMM,
_c2010.
300 _a1 online resource :
_bcolor illustrations.
490 1 _aAusIMM publication series ;
_v11/2010
504 _aIncludes bibliographical references and index.
505 0 0 _tOpen pit production scheduling optimisation -- why the mining industry needs a new phase design approach /
_rK Dagdelen --
_tSteel and iron ore scenario -- an Indian perspective /
_rV S Rao --
_tOptimisation challenges in underground mine planning and design /
_rH Rubinstein, M Brazil, P Grossman, D Lee, D Thomas and N Wormald --
_tEconomics of mine planning and equipment selection /
_rI C Runge --
_tMore than coal mining /
_rJ Tourek --
_tThe next challenge in optimising mining operations /
_rJ Whittle --
_tAdvances in surface mine planning design and computer application --
_tA simulation approach for the comparison of in-pit crushing and conveying truck-shovel mining methods /
_rR Bearman and S Munro --
_tProduction capacity optimisation in the presence of grade uncertainty /
_rT Elkington and F Grobler --
_tRobust versus flexible open pit mine design /
_rB Groweneveld, E Topal and B Leenders --
_tThe role of cost estimating in mine planning and equipment selection /
_rJ B Leinart and O L Schumacher --
_tUltimate pit limit of iron ore mines using maximum flow algorithms /
_rM Osanloo, M Rahmanpour and A Sadri --
_tA new model to improve ore grade reconsiliation between the exploration model and the mine /
_rA Parhizkar, M Ataee, P Moarefvand, V Rasouli and A H Bangian --
_tA new genetic algorithm for open pit design -- the two-dimensional case /
_rJ Saavedra-Rosas --
_tEnterprise optimisation /
_rG Whittle --
_tAdvances in underground mine planning design and computer application --
_tOptimisation improvements in Whittle using stope optimisation software /
_rS Keane --
_tA review of the theory and application of multi-criteria decision analysis techniques in mine planning /
_rC Musingwini --
_tAn investigation to integrate optimum long-term planning with short planning in underground mine production scheduling /
_rM Nehring, E Topal, M Kizil and P Knights --
_tApplication of genetic algorithms for reliability assessment of two mine hositing systems /
_rN Vayenas, X Wu and S Peng --
_tDrilling blasting and excavation engineering --
_tBlast vibration monitoring and elastic wave reflection models to assess blast-induced damage to mine infrastructure -- an underground case study /
_rK G Fleetwood and E Villaescusa --
_tRole of physico-mechanical properties in cutting performance of diamond wire saw in marble quarrying operation /
_rS C Jain and S S Rathore --
_tNever touch a running system? Longwall cutting sequences and their potential /
_rK Nienhaus and S Hetzel --
_tDeveloping algorithms and a computer program to predict the peak particle velocity after blasting in open pit mines and quarries /
_rI⁺ј Topal, B Elevli and K Erarslan --
_tEnvironmental issues in surface and underground mining --
_tNumerical modelling of monorail support requirements in decline development /
_rB Besa, M Kuruppu and E K Chanda --
_tCase study -- The Mogiana quarry reclamation /
_rA Curi and O Quaglio --
_tStudy on utilisation of Flyash for barrier layer/buffer materials for radioactive waste disposal /
_rT Sasaoka, H Shimada and K Matsui --
_tFundamental study of acid drainage control using Flyash /
_rH Shimada, T Sasaoka, K Matsui, G J Kusuma, J Oya, H Takamoto, S Kramadibrata and S Sulistianto --
_tMine automation --
_tSimulation for dependable mining automation /
_rN Hillier and J Ryde --
_tCoal bed boundary detection using infrared technology for longwall shearer automation /
_rK Nienhaus, F Mavroudis and M Warcholik --
_tAdvances in continuous miner automation /
_rJ C Ralston, M T Dunn, C Hargrave and D C Reid --
_tPath planning and position control for autonomous loading operation by wheel loader /
_rS Sarata and N Koyachi --
_tMine equipment selection, utilisation and maintenance --
_tA non-linear programming model for open pit mine equipment selection /
_rA Aghajani Bazzazi, M Osanloo and B Karimi --
_tEquipment selection -- what is the issue? What about the application of simulation packages? /
_rM Campbell --
_tImprovement of mechanical tool performance by waterjet assistance /
_rR Ciccu and B Grosso --
_tOptimum equipment management through life cycle costing /
_rB Hall --
_tPrecision surface mining -- choosing the best tool for the job /
_rJ Hutchins --
_tSoftware tools for open pit trucking studies /
_rS Law --
_tInfrared imager as a tool for monitoring of power shovels, gearcase bearings and electric motos /
_rV Sergeev, M Zhuravlev and R Y Poderni --
_tThe EMESRT approach to equipment design -- bringing end users into the picture /
_rG von Horsten --
_tMine feasibility case studies --
_tRanking of belt conveyor systems for prefeasibility study /
_rE Y Baafi and D A Bedward --
_tBATMIN -- Business analysis tools for mining /
_rD Heugh --
_tPreliminary study on the improvement of afforestation techniques applied to aggregate mines in Japan /
_rY Sakai, Y Sato, K Matsui, H Shimada and T Sasaoka --
_tReopening and production planning of Kirdar -- Yoncali Quarry, Turkey /
_rI⁺ј Topal, B Elevli, H Akc⁺ʹakoca, K Og⁺їul and M M Gu⁺lec⁺ʹ --
_tMine health, safety and environment --
_tAssessment of occupational exposure to whole-body vibration for drivers of mining equipment /
_rV Dentoni, G Massacci and L Piras --
_t'She'll be Right Mate' -- Culture and safety /
_rP Milnes, N S Melkoumian, D Mather, T Milnes, A Stewart and L Tan --
_tUsing haulage accidents and incident reports to identify the impact of substandard haul road design on operational safety /
_rR J Thompson --
_tPrediction of near-field rock damage due to production blasting in limestone quarries, Japan /
_rS Wahyudi, H Shimada, T Sasaoka, S Kubota, Y Ogata and K Matsui --
_tMine planning and block modelling --
_tHierarchical clustering algorithm for block aggregation in open pit mines /
_rH Askari-Nasab, M Tabesh, M M Badiozamani and H Eivazy --
_tOperative expert estimation of innovative policy of mining enterprise technological development using sustainable development principles /
_rS Zh Galiyev, A A Boyandinova and K K Zhussupov --
_tInvestigating the sensitivity of different estimation techniques over block dimensions /
_rA Hekmat and M Osanloo --
_tA new effective labour-planning model for mines /
_rL D Meyer --
_tMining methods and planning --
_tMass mining using room and pillar methods at Estonia Oil Shale Mine /
_rR Freeman and O Nikitin --
_tA tool for benchmark study of roadway development performances /
_rG Gibson and E Y Baafi --
_tPlanning the Kotre Basantpu-Pachmo Coking Coal Mine /
_rM D O'Brien, R Srikanth, A L Visdale and G M Springbett --
_tMining the LG6 Chromitite layer -- a comparison of two approaches /
_rS M Rupprecht --
_tMining system monitoring and simulation --
_tComputer simulation of roadway development to support longwall mining /
_rE Y Baafi and I Porter --
_tInformation and methodical base of simulation modelling of excavator-truck-conveyor complex operation /
_rS Zh Galiyev, A A Boyandinova and Zh A Adilkhanova --
_tSimulation and animation model for the Millerton Coal Mine (New Zealand) /
_rT O'Connell and J R Sturgul --
_tPerformance evaluation of machinery used in dimensional stone mining and processing /
_rS S Rathore and S C Jain --
_tRock mechanics, geotechnical applications and mine environment --
_tA comparison of rebar and spiral bolts using laboratory pull-out tests /
_rS S Kang, D K Je, A Hirata and D Kim --
_tDetermination of fracture toughness of anisotropic rocks under water vapour pressure by semi-circular bend test /
_rM Kuruppu, Y Obara and M Kataoka --
_tPerformance of the coal mine openings and pillars in anisotropic stress field /
_rO⁺ Yulmaz and T U⁺nlu⁺ --
_tFundamental study on fracturing grouting for shaft lining reinforcement at deep alluvium seam in eastern China /
_rQ Yu, H Shimada, T Sasaoka and K Matsui --
_tSustainable development of mining resources --
_tThe application of fuzzy analytical hierarchy processing to define optimal post mining land use for pit area to recognise reclamation costs in open pit mining /
_rA H Bangian, M Ataei, A Sayadi and A Gholinejad --
_tThe effect of the Australian carbon trading scheme on a large scale open pit mining operation /
_rE Chanda, F Ball, J Dunstan, H Maier, P Mumford and C Shaw --
_tEnergy conservation in the Indian mining industry -- an overview /
_rG K Pradhan.
505 0 0 _tPoster papers --
_tSystem optimisation of design and scheduling of open pit mining operations /
_rB Bekmurzayev, D Bukeikhanov and Y Zulkarnayev --
_tMining environmental impacts evaluation in a Karstic zone using geographical information systems /
_rA Curi and V C Garcia --
_tDefining optimal post-mining land use for different sections of mined land through different multi-attribute decision-making techniques in open pit mining /
_rA Gholinejad and A H Bangian --
_tApplication of multi-slicing highwall mining system with stowing at surface coal mine in Thailand /
_rA Hamanaka, T Sasaoka, H. Shimada, K Matsui, H Takamoto, P Meechumna and P Laowattanabandit --
_tAdaptation of hydraulic shovels for artic temperature of Yakutia region /
_rR Y Poderni and H R Koelsh --
_tAn innovative scaled model to simulate the perimeter hole blasting in tunnel /
_rH-S Yang, H-D Jang, W-B Kim and P Rai --
_tSystematic monitoring of operation of mining companies and branches /
_rA Zharmenov, S Galiev, A Lisenkov and S Zhumabekova --
_tRole of ore preparation during chrysotile manufacturing /
_rK K Zhusupov and S Y Punenkov.
650 0 _aMines and mineral resources
_xEquipment and supplies
_vCongresses.
650 0 _aMines and mineral resources
_zAustralia
_vCongresses.
710 2 _aAustralasian Institute of Mining and Metallurgy.
856 4 0 _3Download: Knovel
_uhttps://app.knovel.com/hotlink/toc/id:kpMPESMPE6/mine-planning-equipment/mine-planning-equipment
907 _a.b12257552
_bmngc
_cn
902 _a251209
998 _b0
_c190207
_de
_eh
_fn
_g0
999 _c78801
_d78801