| 000 | 04015nas a2200469 a 4500 | ||
|---|---|---|---|
| 005 | 20260818155856.0 | ||
| 008 | 200611s2018 th uu m rtt 0 a eng d | ||
| 035 | _a.b12307221 | ||
| 099 | 9 | _aAIT Thesis no.ET-18-11 | |
| 100 | 0 | _aRachawadee Puangsukra | |
| 245 | 1 | 0 | _aMulti-objective optimization for enhancing system coordination restoration by placement of fault current limiters on an active distribution system with system reliability considerations |
| 260 |
_aPathum Thani, Thailand : _bAsian Institute of Technology, _c2018 |
||
| 300 |
_a90 leaves : _bill. (some col.) + _e1 online resource |
||
| 490 | 1 |
_aThesis ; _vno. ET-18-11 |
|
| 500 | _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Energy | ||
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology, 2018 | ||
| 520 | _aNowadays, customer satisfaction relies on not only the power delivery, but also in the system reliability. It results a number of measures adopted by utility for reliability improvement. Moreover, distributed generators (DGs) are also enhanced to integrate to distribution system because DGs improve system reliability and capability. However, DGs can lead to mis-operation of protective devices and wider outage areas in power system due to increase in fault level. Moreover, system outage is the vital cause which decreases the system reliability. To mitigate escalation of fault level, fault current limiters (FCLs) are installed to limit incremental fault generated by DGs and improve system reliability. However, to enhance effectiveness of FCLs installation, non-dominated sorting particles swarm optimization (NSPSO) is adopted to find the optimal placement of FCLs. Moreover, novel binary particle swarm optimization and continuous particle swarm optimization are performed optimization simultaneously for selecting installed locations. Therefore, three objectives are considered in optimization process consist of to minimize total cost of fault current limiters installed, to minimize total different of margin operating time of main and backup relay pairs and to maximize system reliability. The optimal results are the set of various solutions conform with multi-objective placed in pareto optimal front, and the result show effectiveness of combined continuous-binary NSPSO. The optimization process is carried out on IEEE 33-bus and IEEE-69 bus radial system. | ||
| 650 | 0 | _aElectric power distribution | |
| 700 | 1 |
_aSingh, Jai Govind, _eChairperson |
|
| 700 | 0 |
_aWeerakorn Ongsakul, _eExamination Committee |
|
| 700 | 0 |
_aLoc, Thai Nguyen, _eExamination committee |
|
| 710 | 2 |
_aPEA, _eScholarship donor |
|
| 710 | 2 |
_aAsian Institute of Technology Education Cooperation Project, _eScholarship donor |
|
| 710 | 2 |
_aRoyal Thai Government Fellowship, _eScholarship donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis; _vno. ET-18-11 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B04579 |
||
| 907 |
_a.b12307221 _bmnait _cm |
||
| 902 | _a240422 | ||
| 998 |
_b0 _c200611 _dm _ea _fm _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 945 | _lmnarc | ||
| 942 | _c40 | ||
| 942 | _c61 | ||
| 942 | _c20 | ||
| 909 |
_aBarcode : 30050120897110 _bCREATED : 2019-04-25 _cRECORD # : i13179664 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : - _bCREATED : 2019-04-25 _cRECORD # : i13179676 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050120984074 _bCREATED : 2020-11-06 _cRECORD # : i13274260 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050120984066 _bCREATED : 2020-11-06 _cRECORD # : i13274272 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c78929 _d78929 |
||