000 03266nas|a2200385 i 4500
005 20260818165857.0
008 250800s2000 th uu m rtt 00| a1eng d
035 _a.b11803022
099 9 _aAIT Thesis no.WM-99-1
100 0 _aChayanis Manusthiparom
245 1 0 _aNeural network models for forecasting hourly water levels and discharges of Chao Phraya River at Bangkok Memorial Bridge
260 _aBangkok :
_bAsian Institute of Technology,
_c2000
300 _a131, A3, B9 leaves
490 1 _aThesis ;
_vno. WM-99-1
500 _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering.
502 _aThesis (M.Eng.) - Asian Institute of Technology, 2000
520 _aHourly flow forecasting is necessary in coastal rivers and estuaries for the purposes of flood control and mitigation, because the water level is greatly affected by the movement of the tidal waves that continually fluctuate and the upland flood discharge as well as local inflows. The interference of the tidal backwater with the upstream flow of the river increases higher flood stages that enlarge flood plain inundation areas and increase potential flood damages. A Neural Network Model known as Back-Propagation algorithm (BP) is presented for forecasting hourly water levels and discharges in the Chao Phraya River at Bangkok Memorial Bridge (Station C4, km 48), Thailand for one, two and three hours in advance. The model considers the river reach from the river mouth at Fort Chula to Bang Sai, a reach length of 112 km. The river flows is influenced by the effects of upstream discharge at Bang Sai (km 112), the tide levels at Fort Chula (km I) and the local inflow along the river reach. The neural network is calibrated and verified based on the observed data and computed results of the MIKE-I I HD model. It was found that the combination of BPNN model and AR(3) model yields even better results of forecasting in this study. However, the comparison of BPNN model with NN model (early stopped by setting target error=0.20)+AR model shows that for the same initial weights and the same output accuracy, the NN+AR model consumes much less computation time especially the node numbers in the neural network model is large.
650 1 0 _aFlood forecasting
_xChao Phraya River
700 1 _aTawatchai Tingsanchali,
_eChairperson
700 1 _aHuynh, Ngoc Phien,
_eExamination Committee
700 1 _aMBabel, Mukand Singh,
_eExamination committee
710 2 _aThe STARR Foundation,
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. WM-99-1
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B06608
907 _a.b11803022
_bmnait
_cu
902 _a240330
998 _b0
_c000825
_dm
_ea
_fu
_g0
945 _lmnait
945 _lmnarc
942 _c22
942 _c40
909 _aBarcode : 30050120592463
_bCREATED : 2014-03-20
_cRECORD # : i12774972
_dLPATRON : 1028100
_eLCHKIN : 2018-08-16
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 1
_iTOT CHKOUT : 1
_jTOT RENEW : 2
909 _aBarcode : 30050160043013
_bCREATED : 2016-03-22
_cRECORD # : i12901854
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c80498
_d80498