000 02831nas a2200349 a 4500
005 20260817161318.0
008 260317s20239999th u ms tm 000 eng d
035 _a.b1248927x
099 9 _aAIT Proj. no.MPM-CM-23-05
100 1 _aTran Quang Huy
245 1 0 _aA contractor's quality management system for procurement and construction works in a building project
260 _aPathum Thani, Thailand :
_bAsian Institute of Technology,
_c2023
300 _a68 leaves :
_bill.+
_e1 online resource
490 1 _aProject;
_vno. MPM-CM-23-05
500 _aA project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management
502 _aProject (M. Eng.) - Asian Institute of Technology, 2023
520 _aBuildings are getting taller and more built in Vietnam today. In particular, Vietnam's construction industry has been modernized with a number of outstanding high-rise buildings. Construction of residential areas and office developments can be considered as spearhead of the construction industry. More and more Contractors are established and compete fiercely on price, quality, site performance, in which construction quality is a decisive factor in competitiveness. However, in the construction industry, all stakeholders are more focused on their actual work, activities are usually very traditional ways of doing things. Thus, they may not pay attention to modern theories and practices obtained from textbooks or literature. As a result, their organization may have missed out on the benefits that could be gained from adaptation of the Quality Management System. Therefore, the purpose of this thesis is to discover a more suitable quality management system that can be applied to the construction of high-rise residential buildings. Finally, through theories and the case study, an important objective is develop a general frame of implementing the Quality Management System in Construction Stage into next constructions projects in the future.
650 0 _aBuildings
_xQuality control
_zVietnam
650 0 _aProject management
_zVietnam
700 1 _aHadikusumo, Bonaventura H. W.,
_eChairperson
700 0 _aChotchai Charoenngam,
_eExamination Committee
700 0 _aSakul Pochanart,
_eExamination Committee
810 2 _aAsian Institute of Technology.
_tProject;
_vno. MPM-CM-23-05
856 4 0 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B23781
907 _a.b1248927x
_bmnarc
_ca
902 _a260327
998 _b0
_c260326
_dm
_eh
_fa
_g0
945 _lmnarc
942 _c67
909 _aBarcode : -
_bCREATED : 2026-03-17
_cRECORD # : i13586452
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c814
_d814