000 06238nas a2200469 a 4500
005 20260817163452.0
008 120924s2012 th uu|m rtt 0| a1eng d
035 _a.b12109344
099 9 _aAIT Thesis no.WM-10-10
100 0 _aKhin Seint Wint
245 1 0 _aAssessing the potential environmental impacts of hydropower projects in Myanmar:
_bcomparison with lignite thermal project and opportunity for clean development mechanism
260 _aPathum Thani, Thailand :
_bAsian Institute of Technology,
_c2011
300 _a192 leaves :
_bill.
490 1 _aThesis ;
_vno. WM-10-10
500 _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Water Engineering and Management
502 _aThesis (M.Eng.) - Asian Institute of Technology, 2011
520 _aHydropower as a source of renewable energy has drawn tremendous interest and investments in recent times in South East Asia, as the region is ill-endowed with fossil energy resources. Along with Southern China, Laos and Thailand, Myanmar has engaged into the development of reservoir projects, while more traditional energy generation techniques still apply (mostly coal-based). However, hydropower projects are raising concerns about their social and environmental impacts, the latter being largely unknown. Required Environmental Impact Assessments are not always carried out properly, and, in any case, fail to reveal possible regional or global impacts, nor transfers of impacts. The present study investigates the potential environmental impacts of two hydropower projects in Myanmar, as compared to one lignite thermal project, using the Life Cycle Assessment (LCA) approach. Further, it investigates the possibilities of implementing Clean Development Mechanism (CDM) scheme options for seeking financial support. The main case study is the so-called Upper Keng Tawng reservoir project, where initial environmental examination is finished, and yet EIA was not completed effectively. It was therefore proposed to undertake environmental impact analysis through LCA, as part of the research. The action does not mean a replacement of EIA, but it intends to provide a more complete picture of impact assessment including regional and global perspectives. LCAs of downstream run-of-river project and neighboring lignite thermal project (Tigyit) have also been carried out, to compare with that of the reservoir project. Static and attributional LCA, based on functional unit of 1 kWh, was performed. The approach considered materials, energy, land use, emission to air, water, and disposal/waste management during construction, and 50-year operation of the studied projects. Transmission and distribution of electricity are excluded from analysis. The SimaPro software (version 7.3) was used, using both EI-99 (H, A) and CML baseline methods for impact assessment. Adjustments from existing database proved necessary since the quality of lignite at Tigyit mine is higher than that of European lignite (667 g/kWh in Tigyit, 1,544 g/kWh in Slovakia, 1,979 g/kWh in Greece and 771 g/kWh in France). Considering 1 kWh of electricity generation at Tigyit coal thermal plant, total estimated impact is 154 mPt whereas impacts of European lignite thermal plants are situated in the range of (+ 15 %) to (- 68 %) of it. Compared with European LCIAs, LCIA of Tigyit coal thermal plant has been more thoroughly documented. It is found that 71 % of overall impact occurs due to particulate matters, sulphur dioxide and sulphur trioxide emission which causes troubles to human respiratory system. When many processes which are not considered in European LCIAs are discarded from the study, 1 kWh of electricity generation at Tigyit coal thermal plant contributes 86.7 mPt whereas impacts of European lignite thermal plants are situated in the range of (+104 % ) to (- 42 %) of it. The study displays that electricity generation of Upper Keng Tawng reservoir project causes 3.15 mPt per kWh and that of Keng Tawng run-of-river project makes 0.911 mPt per kWh. Potential impacts of Upper Keng Tawng reservoir project is 75 % higher than that of Keng Tawng run-of-river project. Compared with run-of-river projects in EU and Switzerland, Keng Tawng (Myanmar) contributes 11 % more impacts. Upper Keng Tawng reservoir project (Myanmar) makes 26 % more impacts than Brazilian reservoir projects. When impact contributions of Tigyit coal thermal project and Keng Tawng and Upper Keng Tawng hydropower projects are compared, reservoir project and run-of-river project
650 0 _aCumulative effects assessment (Environmental assessment)
_zMyanmar
650 0 _aEnvironmental impact analysis
_zMyanmar
650 0 _aWater-power
_zMyanmar
700 1 _aPerret, Sylvain Roger,
_eChairperson
700 1 _aBabel, Mukand Singh,
_eExamination Committee
700 1 _aShrestha, Sangam,
_eExamination Committee
700 1 _aBohez, Erik L.J.,
_eExamination Committee
710 2 _aElectricity Generating Authority of Thailand,
_eScholarship donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. WM-10-10
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B04341
907 _a.b12109344
_bmnait
_cz
902 _a240403
998 _b0
_c120924
_dm
_ea
_fz
_g0
962 _a000:001:PDF:b1210934:000830:0:0:0:0:0:0
_tAbstract
_vn
945 _lmnait
945 _lmnait
945 _lmnarc
942 _c22
942 _c14
942 _c40
909 _aBarcode : 30050120690739
_bCREATED : 2012-09-24
_cRECORD # : i12696079
_dLPATRON : 1028989
_eLCHKIN : 2019-01-19
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 1
_iTOT CHKOUT : 4
_jTOT RENEW : 6
909 _aBarcode : 30050120690705
_bCREATED : 2012-09-24
_cRECORD # : i12696080
_dLPATRON : 1028073
_eLCHKIN : 2019-12-04
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 2
_jTOT RENEW : 0
909 _aBarcode : 30050120230445
_bCREATED : 2016-05-04
_cRECORD # : i12924714
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c8873
_d8873