| 000 | 03750nas a2200481 a 4500 | ||
|---|---|---|---|
| 005 | 20260817163600.0 | ||
| 008 | 200706s2019 th uu m rtt 0| a1eng d | ||
| 035 | _a.b1234641x | ||
| 099 | 9 | _aAIT Thesis no.WM-19-45 | |
| 100 | 1 | _aChinthaka De Mel, Vidanelage Ruwan | |
| 245 | 1 | 0 | _aAssessment of hydropower development impacts on hydrology in the upper Ayeyawady river basin in Myanmar |
| 260 |
_aPathum Thani, Thailand : _bAsian Institute of Technology, _c2019 |
||
| 300 |
_a61 leaves : _bill. (some col.) |
||
| 490 | 1 |
_aThesis; _vno. WM-19-45 |
|
| 502 | _aThesis (M. Eng.) - Asian Institute of Technology, 2019 | ||
| 500 | _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Water Engineering and Management | ||
| 520 | _aSeven hydropower plants are planned to be constructed in the Upper Ayeyarwady River Basin and Myitsone is the largest of them. Currently, only 33 per cent of Myanmar{u2019}s population has access to electricity, therefore finding new sources of energy is essential. In this research, the current flow regime of the Ayeyarwady River at Myitkyina Hydrological Station, just below the proposed Myitsone Reservoir and powerhouse was analyzed. The flow shows great seasonal variation and the long term trend line shows a reduction is flows over the years. Then the effects on natural flow regime due to the construction and operation of the Myitsone hydropower station and Dam were analyzed. It is found that the operations of Myitsone Reservoir will not greatly alter the flow regime of the Ayeyarwady River. This can be attributed to the larger discharge capacity of the powerhouse and the spillways. Three logical future scenarios were also analyzed and the results show that the Myitsone reservoir is more resilient for future changes in inflows and downstream flow demands. An annual reduction of 20% of inflows to the reservoir will only reduce the annual power generation by 10%. At the same time, increasing the pool level of the reservoir by 3m will only increase the power generation by a mere 2%. | ||
| 650 | 0 |
_aHydrology _zMyanmar _zAyeyawady River Basin |
|
| 650 | 0 |
_aWater-power _zMyanmar _zAyeyawady River Basin |
|
| 700 | 1 |
_aShrestha, Sangam, _eChairperson |
|
| 700 | 0 |
_aSutat Weesakul, _eExamination committee |
|
| 700 | 0 |
_aEkasit Kositsakulchai, _eExamination Committee |
|
| 700 | 1 |
_aRoa, Arturo Gementiza, _eExamination Committee |
|
| 700 | 0 |
_aThanapon Piman, _eExamination Committee |
|
| 710 | 2 |
_aAsian Development Bank-Japan Scholarship Program (ADB-JSP), _eScholarship Donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis; _vno. WM-19-45 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B06733 |
||
| 907 |
_a.b1234641x _bmnait _cm |
||
| 902 | _a240422 | ||
| 998 |
_b0 _c200706 _dm _ea _fm _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 945 | _lmnarc | ||
| 942 | _c40 | ||
| 942 | _c61 | ||
| 942 | _c20 | ||
| 909 |
_aBarcode : 30050120889976 _bCREATED : 2020-06-26 _cRECORD # : i13278794 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : - _bCREATED : 2020-06-26 _cRECORD # : i13278812 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050121011604 _bCREATED : 2021-03-15 _cRECORD # : i13332181 _dLPATRON : 1031153 _eLCHKIN : 2022-02-16 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 1 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050121011596 _bCREATED : 2021-03-15 _cRECORD # : i13332193 _dLPATRON : 1031153 _eLCHKIN : 2022-11-03 _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 1 _jTOT RENEW : 1 |
||
| 999 |
_c9164 _d9164 |
||