000 04153cas|a2200421 i 4500
005 20260818174101.0
008 050499s1994 th uzm rtt 00| a1eng d
035 _a.b10524472
099 9 _aAIT Thesis no. EV-94-23
100 1 _aRahman, Abdur
245 1 0 _aPriorities in water pollution control requirements for industries in Pakistan
260 _aBangkok :
_bAsian Institute of Technology,
_c1994
300 _a97 leaves
490 1 _aThesis ;
_vno. EV-94-23
500 _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Science, School of Engineering and Technology
502 _aThesis (M.Sc.) - Asian Institute of Technology, 1994
520 _aThis study envisaged assessment of the total number of industries, total wastewater discharge, BOD load and the toxicity of industrial wastewaters in Pakistan. The industrial sector has been found to be a major contributor of water pollution with BOD, heavy metals and toxic compounds. Only 30 industries have had some kind of water pollution control equipment, but most of them are working at very low levels of treatment. For the effective utilization of scarce resources and to apply a systematic approach for water pollution control, the existing industries have been prioritized. Major priority industries identified are textiles and chemicals among the medium to large scale industries, while tanneries and electroplating are from small scale industries. Large quantities of water are used during textile dyeing and bleaching operations leading to almost equal amount of wastewater generation. While electroplating industry have been found to be discharging highly toxic and hazardous wastewaters into the sewer system without any treatment. The water consumption earl be reduced through in-plant modifications such as water consumption monitoring, controlling the leakage and spillage, optimizing the use of chemicals and using specially designed washers and rinsing equipment and replacing old machinery and equipment with the new ones. To encourage the la_rge and medium scale industries to control the water pollution, economic incentives like tax rebates, subsidies and soft loans should be provided. Combined/central treatment plants should be constructed for small scale industries. In the present circumstances they should have pretreatment at factory site before discharging into the sewer system. The estimated costs for the treatment of textile and electroplating wastewaters are US$ 0. 55 and 1. 27 per m3 respectively. The legislative structure has been found to be insufficient for industrial water pollution control and needs not only revision of existing laws but also inclusion of few more laws and regulations to improve the situation. The enforcement agencies need to be strengthed in terms of trained manpower, equipment and legislative support for effective pollution control.
650 0 _aSewage
_xPurification
650 0 _aIndustry
_xEnvironmental aspects
700 1 _aStoll, -Ing. Uwe,
_eChairperson
700 1 _aUmita, Teruyuki,
_eExamination Committee
700 1 _aLee, Seong-Key,
_eExamination Committee
710 2 _aThe Government of Japan,
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. EV-94-23
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B15787
907 _a.b10524472
_bmnait
_cx
902 _a240404
998 _b2
_c951012
_dm
_ea
_fx
_g0
945 _lmnait
945 _lmnait
945 _lmnarc
942 _c20
942 _c40
909 _aBarcode : 30050003047908
_bCREATED : 1994-05-18
_cRECORD # : i10658191
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050003461455
_bCREATED : 1994-05-18
_cRECORD # : i10658208
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050160055371
_bCREATED : 2016-11-05
_cRECORD # : i12975539
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c92003
_d92003