000 05400nas a2200529 a 4500
005 20260817163647.0
008 200831s2019 th n m|rtt |0 0 eng d
035 _a.b12315813
099 9 _aAIT Thesis no.UWEM-19-01
100 1 _aChahe, Gidion Thobias
245 1 0 _aAssessment of spatial and temporal varied pluvial flood hazard due to climate change and storm surge for the coastal city :
_ba case study of Pattaya city - Thailand
260 _aPathum Thani, Thailand :
_bAsian Institute of Technology,
_c2019
300 _a64 leaves :
_bill. (some col.) +
_e1 online resource
490 1 _aThesis ;
_vno. UWEM-19-01
500 _aA thesis submitted in partial fulfilment of the requirements for the degree of Master of Science in Urban Water Engineering and Management Jointly offered by Asian Institute of Technology, Thailand and UNESCO - IHE, Delft, the Netherlands
502 _aThesis (M.Sc.) - Asian Institute of Technology - UNESCO-IHE, 2019
520 _aUrban areas are prone to flood inundation as a result of a compromised water cycle due to massive land cover change from open field to paved surfaces. Runoff generated has increased at large, conventional infrastructure that is drainage system in place can no longer shield the settlement from flooding. Pluvial flooding is typical kind of flooding describing this inadequacy of stormwater drainage. Despite the fact that urban flooding is becoming a chronic problem yet climate change impacts are making the future become worse than the current situation. The influences on rainfall patterns, intensity and duration along with extreme sea levels pose a great threat to the stormwater drainage system by affecting drainage characteristics and capacity. Discussing potential flood impacts can mainstream the safe handling of the risk prior to the disaster. All stakeholders can join hands when the flood risk is well analysed and communicated, although the trading of potential flood damage and the level of investments to safeguard a certain magnitude of the flood is always complex. From this study, a ID2D model used to simulate future flood extent in the one-day event for the projected 2years, 5 years and 25 years rainfall intensities combined with sea level rise and 10 years storm surge by the year 2050. After analysis of the potential economic impacts, daily direct damage to the buildings estimated at 9.1M THB, 19.6M THB and 34.1M THB respectively, adding to that indirect damages estimated at 1.1M THB, 1.89M THB and 2.19M THB respectively. To counter the damage caused by resulted pluvial flood, different mitigation approaches were tested against 5 years rain and elevated sea levels superimposed with 10 years storm surge. These approaches included doubling pipe size to enhance drainage capacity, employing 4000m3 detention ponds for increasing storage capacity, lowering runoff coefficient to 50% and a combination of three measures in a suggested proportion. The lowering of runoff to 50% outscored the rest by reducing the initial damage by 7.6M THB, the combination of the measures comes the second by saving 4.5M THB despite a reduction of coefficient of runoff by only 20%, applying 2000m3 detention volume and increasing the pipe size by 20%. To assess the effectiveness of flood mitigation measures against the expense involved is considered to be an iterative process, therefore, all possible options and the combinations have to be considered. Then the refined measures and adaptation strategy can be drawn to meet both short term and long term flood impacts mitigation targets.
650 0 _aFlood control
_zThailand
_zPattaya
650 0 _aClimatic changes
_zThailand
_zPattaya
650 0 _aFloods
_zThailand
_zPattaya
700 1 _aXue, Wenchao,
_eChairperson
700 1 _aRanasinghe, Roshanka,
_eCo-chairperson
700 1 _aVisvanathan, C.,
_eExamination Committee
700 1 _aTorres, Arlex Sanchez,
_eExamination committee
700 0 _aSutat Weesakul,
_eExamination committee
700 1 _aVojinovic, Zoran,
_eExamination committee
710 2 _aNetherlands Fellowship Program (NFP),
_eScholarship donor
710 2 _aUNESCO-IHE,
_eScholarship donor
710 2 _aAsian Institute of Technology Fellowship,
_eScholarship donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. UWEM-19-01
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B06297
907 _a.b12315813
_bmnait
_cm
902 _a240422
998 _b0
_c200831
_dm
_ea
_fm
_g0
945 _lmnait
945 _lmnait
945 _lmnarc
945 _lmnarc
942 _c40
942 _c67
942 _c20
909 _aBarcode : 30050120876999
_bCREATED : 2019-06-25
_cRECORD # : i13197939
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : -
_bCREATED : 2019-06-25
_cRECORD # : i13197940
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050120980015
_bCREATED : 2020-08-31
_cRECORD # : i13292328
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
909 _aBarcode : 30050120980007
_bCREATED : 2020-08-31
_cRECORD # : i1329233x
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c9376
_d9376