| 000 | 03012nas|a2200409 i 4500 | ||
|---|---|---|---|
| 005 | 20260818174631.0 | ||
| 008 | 121095s1985 th uu m rtt 00| a1eng d | ||
| 035 | _a.b10529421 | ||
| 099 | 9 | _aAIT RSPR no. IE-85-15 | |
| 100 | 0 | _aWisit Rutchatathiwat | |
| 245 | 1 | 0 | _aProduction planning models for a refractory production system |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1985 |
||
| 300 | _a1 v. (various pagings) | ||
| 490 | 1 |
_aResearch studies project report ; _vno. IE-85-15 |
|
| 500 | _aA research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology | ||
| 502 | _aResearch Studies Project Report (M. Eng.) - Asian Institute of Technology, 1985 | ||
| 520 | _aThis research study covers all production planning requirements for Refractory Plant . It includes production scheduling , raw material requirements planning, manpower planning, and plant capacity planning. Actually, these models are divided to three levels for different purpose of planning . The short-term plan is the lowest level to find the exact schedule of production . The medium-term plan is the level of preparing facilities for short-term plan. The long-term plan is for predicting the future and preparing facilities for the future. The scheduling model is a simulation model using real data . The medium-term and long-term production models are aggregate production model (APP) using linear programming technique to solve the problems. The manpower planning model uses a heuristic model to choose the best schedule of workers and number of workers required for each machine . The material requirements planning model use results of APP and the modification of MRP to solve the problem. The plant capacity planning is a part of APP model. | ||
| 650 | 0 | _aProduction planning | |
| 700 | 1 |
_aTabucanon, Mario T., _eChairperson |
|
| 700 | 1 |
_aTang, John C.S., _eExamination Committee |
|
| 700 | 1 |
_aLu, Iuan-Yuan, _eExamination Committee |
|
| 710 | 2 |
_aSiam Cement Group, _eScholarship Donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tResearch studies project report ; _vno. IE-85-15 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B19890 |
||
| 907 |
_a.b10529421 _bmnait _cy |
||
| 902 | _a240404 | ||
| 998 |
_b2 _c951012 _dm _ea _fy _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c20 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050003110631 _bCREATED : 1995-10-15 _cRECORD # : i10664324 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050003110623 _bCREATED : 1995-10-15 _cRECORD # : i10664336 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050160109749 _bCREATED : 2016-08-04 _cRECORD # : i12932632 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c94121 _d94121 |
||