| 000 | 03140nas|a2200409 i 4500 | ||
|---|---|---|---|
| 005 | 20260817163709.0 | ||
| 008 | 040615s2003 th uzm rtt 00| a1eng d | ||
| 035 | _a.b11929157 | ||
| 099 | 9 | _aAIT Thesis no.ET-03-16 | |
| 100 | 0 | _aPanich Jantasim | |
| 245 | 1 | 2 | _aAn assessment of the potential for integrated utility service for the New Bangkok International Airport |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c2003 |
||
| 300 | _a54 leaves | ||
| 490 | 1 |
_aThesis ; _vno. ET-03-16 |
|
| 500 | _aA thesis study submitted in partial fulfillment of the requirement for the degree of Master of Engineering | ||
| 502 | _aThesis (M.Eng.) - Asian Institute of Technology, 2003 | ||
| 520 | _aThe infrastructure requirements of modem international airports are complex and diversified. Electricity and chilled water supply are important infrastructural needs of airports and, therefore requires high degree of reliability. In a conventional chilled water system, each building will have its own chilled water generating system using electrical chillers. Electricity will be used for power and lighting as well as air-conditioning system. Conventional power plants are usually about 40% efficiency, i.e. 60% of the energy is lost to the environment. By capturing this waste heat and using it in a secondary process, efficiency of up to 70% can be achieved. In a Cogeneration plant, a gas turbine generates electrical power. The waste heat is then collected from the gas turbine exhaust and passed through absorption chillers where the secondary energy source, chilled water, is generated. This study focuses on the integrated utility service for the New Bangkok International Airport. The integrated utility service was investigated both in technical and economics aspects. The suitable technology for this airport was found to be 50,000 kW gas turbine combined cycle with 14,000 RT absorption chillers. From economic analysis, payback period is found about 10 year and the internal rate of return about 8%. | ||
| 650 | 0 |
_aInternational airports _xPower supply _zThailand |
|
| 650 | 0 |
_aElectric power consumption _zThailand |
|
| 650 | 0 |
_aElectric utilities _zThailand |
|
| 700 | 0 |
_aSurapong Chirarattananon _eChairperson |
|
| 700 | 1 |
_aSribas C. Bhattacharya _eExamination Committee |
|
| 700 | 1 |
_aSivanappan Kumar _eExamination Committee |
|
| 710 | 2 |
_aElectricity Generating Authority of Thailand _eScholarship Donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. ET-03-16 |
|
| 856 |
_3Full-Text _u http://203.159.5.9/ait-thesis/detail.php?q=B11545 |
||
| 907 |
_a.b11929157 _bmnait _cu |
||
| 902 | _a240417 | ||
| 998 |
_b0 _c040611 _dm _ea _fu _g2 |
||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c22 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050120601116 _bCREATED : 2013-11-21 _cRECORD # : i12747804 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050160046834 _bCREATED : 2016-07-06 _cRECORD # : i13020249 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c9475 _d9475 |
||