| 000 | 04231nam a2200385 4500 | ||
|---|---|---|---|
| 005 | 20260818175545.0 | ||
| 008 | 091198 1986 th r 0000|0 eng d | ||
| 035 | _a.b10546510 | ||
| 099 | 9 | _aAIT Thesis no.HS-86-07 | |
| 100 | 1 | _aFerozuddin, Mohammad | |
| 245 | 1 | 0 | _aRealistic vision or hopeless dreams? Development plans for Upazila Centres in Bangladesh |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1986 |
||
| 300 | _a129 p. | ||
| 490 | 1 |
_aThesis ; _vno. HS-86-07 |
|
| 500 | _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Science | ||
| 502 | _aThesis (M.Sc.) - Asian Institute of Technology, 1986 | ||
| 520 | _aIn Bangladesh, the programme to promote about 400 "Upazila" (sub- district) centres has theoretically increased the possibilities of more equitable and even distribution of development benefits. Preparing physical plans for the centres is also a positive step in order to have well- organized and efficient urban places at the much needed lower tier of the urban system. But how valid the theoretical concept may be, the biggest question is whether it will be possible for a country like Bangladesh to plan, finance, manage a programme on such a huge number of centres. The programme is likely to be hampered because of the severe lack of funds, lack of educated and skilled manpower and also difficulty in extending urban development on agricultural land due to very low land-man ratio. Against such limitations the UZ programme appears very much ambitious. The present study intended to explore the plan preparation process in order to assess the proposals made for the UZ centres under such unavoidable realities. In addition to the review of a representative sample of 20 plans and a number of related documents, an interview was conducted with a number of experts associated with the programme . The main findings of the study were that the plan preparation process: is inappropriate due to the misconceptions, unrealistic assumptions, unaffordable standards; does not take care of the national need of conserving agricultural l and from other uses; does not recognize the limitations of resources - the funds, manpower, institution, to implement the plans. As a result the plans prepared so far are not the ones really needed and they have a marginal chance of getting implemented. Based on such findings the study calls for a rather radical change of approach which places resource identification before embarking plan preparation. The logic is very simple. What will be planned is going to be implemented. It also recommends: formulation of national human settlement hierarchy with identification of the development policies for different levels of urban centres; national land use policy to protect scarce agricultural land from misuse vis a vis affordable standards for urban areas. The study strongly recommends that due to limitations of resources of all kind the programme has to be phased out in a manner to get the prepared plans implemented. It also outlines the possible measures on specific issues to improve the plan preparation process. | ||
| 650 | 0 |
_aRural development _xBangladesh |
|
| 700 | 1 |
_aKammeier, Hans Detlef, _eChairperson |
|
| 700 | 1 |
_aArcher, Raymon W., _eExamination Committee |
|
| 700 | 1 |
_aTips, Walter E. J., _eExamination Committee |
|
| 710 | 2 |
_aCanadian International Development Agency - Broad Based Development Programme (CIDA- BBDP), _eScholarship Donor |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. HS-86-07 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B19717 |
||
| 907 |
_a.b10546510 _bmnait _cs |
||
| 902 | _a260107 | ||
| 998 |
_b2 _c951012 _dm _ea _fs _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c22 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30050120733992 _bCREATED : 2014-05-21 _cRECORD # : i12802335 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050120305635 _bCREATED : 2016-01-06 _cRECORD # : i13007865 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c97781 _d97781 |
||