| 000 | 03341nam a2200421 4500 | ||
|---|---|---|---|
| 005 | 20260818175549.0 | ||
| 008 | th eng | ||
| 035 | _a.b11533614 | ||
| 099 | 9 | _aAIT Thesis no. GE-95-13 | |
| 100 | 0 | _aWasu Likitwanagarn | |
| 245 | 1 | 0 | _aReanalysis of preloading with prefabricated vertical drains for the Bangkok-Chonburi Highway Project and the Outer Bangkok Ring Road Project |
| 260 |
_aBangkok : _bAsian Institute of Technology, _c1996 |
||
| 300 | _a162 leaves | ||
| 490 | 1 |
_aThesis ; _vno. GE-95-13 |
|
| 500 | _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Civil Engineering | ||
| 502 | _aThesis (M. Eng.) - Asian Institute of Technology, 1996 | ||
| 520 | _aIn the Thailand Department of Highways (DOH) Projects of the, Second Bangkok Chonburi Highway and Outer Bangkok Ring Road Projects, the preloading with prefabricated vertical drain (PVD) were used to improve the subsoil layer. The instrumentation were installed to measure the behaviour of foundation soil under the highway embankment loading in the field. The observed settlement data were considered to provide us with reliable and direct information which are representative of the soil mass in the subsoil. In this study, soil parameters were determined by back-calculation. ASAOKA method was used to back-calculate the soil parameters from the monitoring data. The back-figured horizontal coefficient of consolidation (C11) was used to predict the amount and rate of settlements. Good agreement were obtained in case of ASAOKA method. One-dimensional and SKEMPTON & BJERRUM method were slightly higher in both highway embankment except section 2A/1 of SBCH which is rather high. The back-calculated C11 value of SBCH range from 8.6 to 87 m 2 /yr and 11 to 40 m 2 /yr for OBRR. The alternative construction sequence were predict by using the back-figured soil parameters in combination with SHANSEP method. The preloading time was reduced to about 2 to 4 months using the alternative construction sequence compared to the original proposed one | ||
| 610 | 1 | 0 | _aSecond Bangkok-Chonburi Highway Project |
| 610 | 2 | 0 | _aOuter Bangkok Ring Road Project |
| 650 | 0 | _aVertical drains | |
| 700 | 1 |
_aBergado, Dennes T., _eChairperson |
|
| 700 | 0 |
_aNoppadol Phien-Wej, _eExamination Committee |
|
| 700 | 1 |
_aSugimoto, M., _eExamination Committee |
|
| 810 | 2 |
_aAsian Institute of Technology. _tThesis ; _vno. GE-95-13 |
|
| 856 |
_3Full-Text _uhttp://203.159.5.9/ait-thesis/detail.php?q=B15104 |
||
| 907 |
_a.b11533614 _bmnait _cv |
||
| 902 | _a241101 | ||
| 998 |
_b0 _c960910 _dm _ea _fv _g0 |
||
| 945 | _lmnait | ||
| 945 | _lmnait | ||
| 945 | _lmnarc | ||
| 942 | _c20 | ||
| 942 | _c40 | ||
| 909 |
_aBarcode : 30020220000452 _bCREATED : 1995-04-13 _cRECORD # : i11836611 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30020220000445 _bCREATED : 1995-04-13 _cRECORD # : i11836623 _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 909 |
_aBarcode : 30050160081732 _bCREATED : 2016-05-16 _cRECORD # : i1297805x _dLPATRON : 0 _eLCHKIN : - _f# RENEWALS : 0 _g# OVERDUE : 0 _hIUSE3 : 0 _iTOT CHKOUT : 0 _jTOT RENEW : 0 |
||
| 999 |
_c97803 _d97803 |
||