000 03752nas a2200409 a 4500
005 20260818175924.0
008 090907s2009 th uu|m rtt 0| a1eng d
035 _a.b12067180
099 9 _aAIT Thesis no.OTM-09-03
100 0 _aChompoonut Junkongsuwan
245 1 0 _aReliability-based decision making in offshore platform construction management
260 _aPathum Thani, Thailand :
_bAsian Institute of Technology,
_c2009
300 _a95 leaves :
_bill.
490 1 _aThesis ;
_vno. OTM-09-03
500 _aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Offshore Technology and Management, School of Engineering and Technology
502 _aThesis (M.Eng.) - Asian Institute of Technology, 2009
520 _aThe objective of this study was to propose a systematic approach based primarily upon reliability analysis for decision making in fixed offshore platform construction management. In this study, basic concepts of statistic, reliability, planning and scheduling were reviewed and the optimum decision making was based on minimum expected loss. The proposed procedure could be explained briefly as followed. Firstly, engineering data collection was essential in order to define the statistical properties and relationships of activities. Monte Carlo simulation was utilized to prior estimate the future project duration through a statistically valid model. Once a set of project duration was obtained, the best fitted distribution was considered by the Chi-Square Test and the Kolmogorov-Smirnov Test. It was used to evaluate the probability to complete a project in a specific time. The shorten duration was required to increase reliability of plan. The expected loss against the probability of project delays was also acquired from the model. The optimum reduction time was based on minimum expected loss criterion. The applicability of proposed procedure could be illustrated by a case study of 4 legs-pile jacket including 102 activities. Analytical results showed that Monte Carlo simulation and project scheduling were able to work together very well. The statistical analysis of project duration distribution was invaluable information for better decisions. The benefits of this procedure were (1) selection of proper bidding and contract strategies (2) effective planning and control project (3) optimal solution for any decision making. (4) reduction of expected loss. From the case study shown, the 13% shorten project duration could reduce the expected loss approximately up to 90% of conventional planning.
650 0 _aOffshore oil industry
_xDesign and construction
_xDecision making
650 0 _aProject management
_xDecision making
700 1 _aChiu, Gregory L.F.,
_eChairperson
700 0 _aPoovadol Sirirangsi,
_eExamination committee
700 0 _aWinai Ouypornprasert,
_eExamination committee
700 1 _aWidjaja, Joko Harsono,
_eExamination Committee
710 2 _aRTG Fellowship,
_eScholarship Donor
810 2 _aAsian Institute of Technology.
_tThesis ;
_vno. OTM-09-03
856 _3Full-Text
_uhttp://203.159.5.9/ait-thesis/detail.php?q=B03588
907 _a.b12067180
_bmnait
_cu
902 _a240329
998 _b0
_c090907
_dm
_ea
_fu
_g0
945 _lmnait
945 _lmnarc
942 _c22
942 _c40
909 _aBarcode : 30050120843387
_bCREATED : 2014-05-19
_cRECORD # : i12800740
_dLPATRON : 1027177
_eLCHKIN : 2017-02-09
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 2
_iTOT CHKOUT : 4
_jTOT RENEW : 0
909 _aBarcode : 30050160006416
_bCREATED : 2016-03-23
_cRECORD # : i12905823
_dLPATRON : 0
_eLCHKIN : -
_f# RENEWALS : 0
_g# OVERDUE : 0
_hIUSE3 : 0
_iTOT CHKOUT : 0
_jTOT RENEW : 0
999 _c99177
_d99177