Contract administration procedure for World Bank funded construction projects in Afghanistan

By: Call Number: AIT SSPR no.CM-17-01 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Special studies project report ; no. CM-17-01Publication details: Bangkok : Asian Institute of Technology, 2017Description: 1 online resource (87 leaves) : illSubject(s): Online resources: Dissertation note: Research report (M. BA.) - Asian Institute of Technology, 2017 Summary: Ineffective contract administration procedures plays a vital rolein typical construction problems such as extensive delays in planned schedule cost overruns, very serious problem in quality, and an increased number of claim and litigation. Due to the different culture in each country, Afghan contract administration procedures were investigated from World Bank construction projects. This study was conducted by focusing on contract administration procedures during construction phase as payment, request extension o time, submittal and approval, inspection, change order, and delay procedures.Date was included contract conditions and clauses from case study World Bankconstruction project. In addition, the supportive information was collected through personal interview. The in-depth experienced consultant was interviewed based on the data provided from the contract conditions in order to get more reliable information. The obtained data was analyzed to indentify the contract administration procedures during the construction phase in practice from World Bankby using the frequency distribution statistical analysis. Also, the strengths and weaknesses of each procedure can be determined via personal interview.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT SSPR no.CM-17-01 (Browse shelf(Opens below)) 1 Available 30050120960116
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT SSPR no.CM-17-01 (Browse shelf(Opens below)) 2 Available 30050120960082
40-Archives Asian Institute of Technology Library Archives AIT SSPR no.CM-17-01 (Browse shelf(Opens below)) 1 Available 30050120876627

A research submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Construction, Engineering and Infrastructure Management

Research report (M. BA.) - Asian Institute of Technology, 2017

Ineffective contract administration procedures plays a vital rolein typical construction problems such as extensive delays in planned schedule cost overruns, very serious problem in quality, and an increased number of claim and litigation. Due to the different culture in each country, Afghan contract administration procedures were investigated from World Bank construction projects. This study was conducted by focusing on contract administration procedures during construction phase as payment, request extension o time, submittal and approval, inspection, change order, and delay procedures.Date was included contract conditions and clauses from case study World Bankconstruction project. In addition, the supportive information was collected through personal interview. The in-depth experienced consultant was interviewed based on the data provided from the contract conditions in order to get more reliable information. The obtained data was analyzed to indentify the contract administration procedures during the construction phase in practice from World Bankby using the frequency distribution statistical analysis. Also, the strengths and weaknesses of each procedure can be determined via personal interview.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!