Aggregate production planning using goal programming
Call Number: AIT SSPR no. IE-82-17 Material type:
SeriesSeries: Asian Institute of Technology. Special studies project report ; no. IE-82-17Publication details: Bangkok : Asian Institute of Technology, 1982Description: 1 v. (various pagings)Subject(s): Online resources: Dissertation note: Special Studies Project Report (M. Eng.) - Asian Institute of Technology, 1982 Summary: This study presents a Goal Programming model of production planning and scheduling in multiproduct, multiperiod and multistage production system. An important point in multistage production system is that workforce of all stages can not be combined together in order to find out optimal production and work force levels. So stages has been divided into two types. (1)Those whose workforce is transferable to other stages and (2) those whose workforce is non-transferable to other stages because these stages require specialized knowledge and skill. Like many other real life problems, production planning also involves multiple conflicting objectives. Unlike other models, these objectives have been considered individually and for this purpose Goal Programming approach is used. A hypothetical example is solved to test the model. Problems encountered in solving the problem by computer programs are discussed. Sensitivity analysis is performed by various arrangements of the goal priority levels.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
22-AIT Thesis (Replacement)
|
Asian Institute of Technology Library AIT Publications | AIT SSPR no. IE-82-17 (Browse shelf(Opens below)) | 3 | Available | 30050120568026 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT SSPR no. IE-82-17 (Browse shelf(Opens below)) | 1 | Available | 30050120346498 |
A special study submitted in partial fulfillment of the requirement for the degree of Master of Engineering, School of Engineering and Technology
Special Studies Project Report (M. Eng.) - Asian Institute of Technology, 1982
This study presents a Goal Programming model of production planning and scheduling in multiproduct, multiperiod and multistage production system. An important point in multistage production system is that workforce of all stages can not be combined together in order to find out optimal production and work force levels. So stages has been divided into two types. (1)Those whose workforce is transferable to other stages and (2) those whose workforce is non-transferable to other stages because these stages require specialized knowledge and skill. Like many other real life problems, production planning also involves multiple conflicting objectives. Unlike other models, these objectives have been considered individually and for this purpose Goal Programming approach is used. A hypothetical example is solved to test the model. Problems encountered in solving the problem by computer programs are discussed. Sensitivity analysis is performed by various arrangements of the goal priority levels.
There are no comments on this title.

AI Search