Offshore construction planning and scheduling under resource constraints

By: Call Number: AIT Thesis no.OTM-09-02 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Thesis ; no. OTM-09-02Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2009Description: 146 p. : illSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 2009 Summary: The objective of this study is to propose a systematic planning procedure under resource constraints in offshore constructions. This study incorporates the statistics of engineering data into the planning package of the offshore construction project to predict the construction's duration based on the existed resource capacity. Once critical resources are identified, the best fitted commonly used continuous distribution for each set of engineering data can be considered by Chi-Square and Kolmogorov-Smimov test. Then the Monte Carlo simulation based on statistics of engineering data is used to create the probabilistic-based model. This model is able to generate the realistic project's duration, dominant critical path from the various resources in each activity and the success rate from the resource constraints in offshore construction. The proposed systematic procedure above was applied to 4 legs jacket fabrication as a case study of this paper. The result of this study can be applied for both the optimum resource allocation plan in resource planning stage and strategic decision making to prevent the liquidate damage or penalty in the bidding stage. Finally, the case study shows that the proposed procedure could be a powerful tool to reduce the uncertainty for more reliable planning package.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
22-AIT Thesis (Replacement) Asian Institute of Technology Library AIT Publications AIT Thesis no.OTM-09-02 (Browse shelf(Opens below)) 3 Available 30050120685747
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.OTM-09-02 (Browse shelf(Opens below)) 1 Available 30050160006424

C. 2 bounded in leaves

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Offshore Technology and Management, School of Engineering and Technology

Thesis (M.Eng.) - Asian Institute of Technology, 2009

The objective of this study is to propose a systematic planning procedure under resource constraints in offshore constructions. This study incorporates the statistics of engineering data into the planning package of the offshore construction project to predict the construction's duration based on the existed resource capacity. Once critical resources are identified, the best fitted commonly used continuous distribution for each set of engineering data can be considered by Chi-Square and Kolmogorov-Smimov test. Then the Monte Carlo simulation based on statistics of engineering data is used to create the probabilistic-based model. This model is able to generate the realistic project's duration, dominant critical path from the various resources in each activity and the success rate from the resource constraints in offshore construction. The proposed systematic procedure above was applied to 4 legs jacket fabrication as a case study of this paper. The result of this study can be applied for both the optimum resource allocation plan in resource planning stage and strategic decision making to prevent the liquidate damage or penalty in the bidding stage. Finally, the case study shows that the proposed procedure could be a powerful tool to reduce the uncertainty for more reliable planning package.

There are no comments on this title.