Studies on energy use at the Bangkok Glass factory, where a 360 tons of glass are produced each day, have been carried out. Energy auditing has been done in the thermal energy utilization unit . Break downs of energy consumption have been made. Energy analysis and availability analysis are applied to the melting units which are the most significant energy consumers. Both the first and second law efficiency of the melting units have been investigated. The important energy losses have been identified. Feasible energy conservation measures are applied. Use of waste heat instead of electrical energy to reduce oil viscosity can save about 1. 13 million baht/year. The cogeneration feasibility has been also investigated. The payback period of the cogeneration is less than 4 years while the system gives an internal rate of return of higher than 32 %.
Energy conservation--Thailand--Bangkok
Energy conservation in the Bangkok glass factory - Bangkok : Asian Institute of Technology, 1988 - 96 p. - Research studies project report ; no. ET-88-5 . - Asian Institute of Technology. Research studies project report ; no. ET-88-5 .
A research study (9 credits) submitted in partial fulfillment of the requirement for the degree of Master of Engineering, School of Environment, Resources and Development
Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1988
Studies on energy use at the Bangkok Glass factory, where a 360 tons of glass are produced each day, have been carried out. Energy auditing has been done in the thermal energy utilization unit . Break downs of energy consumption have been made. Energy analysis and availability analysis are applied to the melting units which are the most significant energy consumers. Both the first and second law efficiency of the melting units have been investigated. The important energy losses have been identified. Feasible energy conservation measures are applied. Use of waste heat instead of electrical energy to reduce oil viscosity can save about 1. 13 million baht/year. The cogeneration feasibility has been also investigated. The payback period of the cogeneration is less than 4 years while the system gives an internal rate of return of higher than 32 %.
Energy conservation--Thailand--Bangkok