Energy conservation in the Bangkok glass factory

By: Call Number: AIT RSPR no. ET-88-5 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Research studies project report ; no. ET-88-5Publication details: Bangkok : Asian Institute of Technology, 1988Description: 96 pSubject(s): Online resources: Dissertation note: Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1988 Summary: Studies on energy use at the Bangkok Glass factory, where a 360 tons of glass are produced each day, have been carried out. Energy auditing has been done in the thermal energy utilization unit . Break downs of energy consumption have been made. Energy analysis and availability analysis are applied to the melting units which are the most significant energy consumers. Both the first and second law efficiency of the melting units have been investigated. The important energy losses have been identified. Feasible energy conservation measures are applied. Use of waste heat instead of electrical energy to reduce oil viscosity can save about 1. 13 million baht/year. The cogeneration feasibility has been also investigated. The payback period of the cogeneration is less than 4 years while the system gives an internal rate of return of higher than 32 %.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT RSPR no. ET-88-5 (Browse shelf(Opens below)) 1 Available 30050002791357
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT RSPR no. ET-88-5 (Browse shelf(Opens below)) 2 Available 30050003123428
40-Archives Asian Institute of Technology Library Archives AIT RSPR no. ET-88-5 (Browse shelf(Opens below)) Available 30050160015920

A research study (9 credits) submitted in partial fulfillment of the requirement for the degree of Master of Engineering, School of Environment, Resources and Development

Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1988

Studies on energy use at the Bangkok Glass factory, where a 360 tons of glass are produced each day, have been carried out. Energy auditing has been done in the thermal energy utilization unit . Break downs of energy consumption have been made. Energy analysis and availability analysis are applied to the melting units which are the most significant energy consumers. Both the first and second law efficiency of the melting units have been investigated. The important energy losses have been identified. Feasible energy conservation measures are applied. Use of waste heat instead of electrical energy to reduce oil viscosity can save about 1. 13 million baht/year. The cogeneration feasibility has been also investigated. The payback period of the cogeneration is less than 4 years while the system gives an internal rate of return of higher than 32 %.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!