Comparison of project management approaches between steel box grinder using launching method and temporary support in bridge project (Record no. 20003)

MARC details
000 -LEADER
fixed length control field 03022nas a2200349 a 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20260818084319.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 260319s20209999th u ms tm 000 eng d
035 ## - SYSTEM CONTROL NUMBER
System control number .b12491603
099 #9 - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number AIT Proj. no.MPM-MM-CM-20-05
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Thant Zin
245 10 - TITLE STATEMENT
Title Comparison of project management approaches between steel box grinder using launching method and temporary support in bridge project
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Pathum Thani, Thailand :
Name of publisher, distributor, etc. Asian Institute of Technology,
Date of publication, distribution, etc. 2020
300 ## - PHYSICAL DESCRIPTION
Extent 145 leaves :
Other physical details ill. +
Accompanying material 1 online resource
490 1# - SERIES STATEMENT
Series statement Project ;
Volume/sequential designation no. MPM-MM-CM-20-05
500 ## - GENERAL NOTE
General note A project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management
502 ## - DISSERTATION NOTE
Dissertation note Project (M. Eng.) - Asian Institute of Technology, 2020
520 ## - SUMMARY, ETC.
Summary, etc. Nowadays, Myanmar is on the way to democracy economic system. It is the first priority to promote country{u2019}s economic development. Then, basic infrastructure like road and bridge, railways, waterway, electricity, telecommunication, water supply, financial institution, ect are needed a lot to be constructed as it can carry out the economic activities and which help in economic development of the country. Not only new infrastructure to be built but also old infrastructure have to be repaired and upgraded. For road and bridge infrastructure which is under the ministry of construction. The government has allocated sufficient budget for both new building and system upgrading to fulfill the increasing infrastructure requirement. For public infrastructure project, mostly it is implemented base on annual budget, and it has both budget and time constraint. Therefore, it is a big challenge to complete the project within budget limitation and defined period. A suitable construction method could be used during the execution of a construction project to reduce construction time and cost. This report proposes two difference construction methods like launching method and temporary support method used in the bridge project. Analysis has carried out to find out key aspect in term of project management and it can help to improve the selection of construction methods for a bridge.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Project management
Geographic subdivision Myanmar
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Bridges
General subdivision Design and construction
Geographic subdivision Myanmar
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Hadikusumo, Bonaventura H. W.,
Relator term Chairperson
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Chotchai Charoenngam,
Relator term Examination Committee
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Wasan Teerajetgul,
Relator term Examination Committee
810 2# - SERIES ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Asian Institute of Technology.
Title of a work Project ;
Volume/sequential designation no. MPM-MM-CM-20-05
856 ## - ELECTRONIC LOCATION AND ACCESS
Materials specified Full-Text
Uniform Resource Identifier <a href="http://203.159.5.9/ait-thesis/detail.php?q=B23814">http://203.159.5.9/ait-thesis/detail.php?q=B23814</a>
907 ## - LOCAL DATA ELEMENT G, LDG (RLIN)
a .b12491603
b mnarc
c a
902 ## - LOCAL DATA ELEMENT B, LDB (RLIN)
a 260330
998 ## - LOCAL CONTROL INFORMATION (RLIN)
Operator's initials, OID (RLIN) 0
Cataloger's initials, CIN (RLIN) 260330
First date, FD (RLIN) m
-- h
-- a
-- 0
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnarc
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 67-Electronic Resource
909 ## - LOCAL ITEMS USED
Barcode Barcode : -
CREATED CREATED : 2026-03-19
RECORD Id RECORD # : i13588746
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Shelving location Date acquired Total checkouts Full call number Date last seen Copy number Price effective from Koha item type
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library Archives 18/08/2026   AIT Proj. no.MPM-MM-CM-20-05 18/08/2026 1 18/08/2026 67-Electronic Resource
คัดลอกแล้ว!