Comparison of project management approaches between steel box grinder using launching method and temporary support in bridge project
Call Number: AIT Proj. no.MPM-MM-CM-20-05 Material type:
SeriesSeries: Asian Institute of Technology. Project ; no. MPM-MM-CM-20-05Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2020Description: 145 leaves : ill. + 1 online resourceSubject(s): Online resources: Dissertation note: Project (M. Eng.) - Asian Institute of Technology, 2020 Summary: Nowadays, Myanmar is on the way to democracy economic system. It is the first priority to promote country{u2019}s economic development. Then, basic infrastructure like road and bridge, railways, waterway, electricity, telecommunication, water supply, financial institution, ect are needed a lot to be constructed as it can carry out the economic activities and which help in economic development of the country. Not only new infrastructure to be built but also old infrastructure have to be repaired and upgraded. For road and bridge infrastructure which is under the ministry of construction. The government has allocated sufficient budget for both new building and system upgrading to fulfill the increasing infrastructure requirement. For public infrastructure project, mostly it is implemented base on annual budget, and it has both budget and time constraint. Therefore, it is a big challenge to complete the project within budget limitation and defined period. A suitable construction method could be used during the execution of a construction project to reduce construction time and cost. This report proposes two difference construction methods like launching method and temporary support method used in the bridge project. Analysis has carried out to find out key aspect in term of project management and it can help to improve the selection of construction methods for a bridge.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
67-Electronic Resource
|
Asian Institute of Technology Library Archives | AIT Proj. no.MPM-MM-CM-20-05 (Browse shelf(Opens below)) | 1 | Not for loan |
A project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management
Project (M. Eng.) - Asian Institute of Technology, 2020
Nowadays, Myanmar is on the way to democracy economic system. It is the first priority to promote country{u2019}s economic development. Then, basic infrastructure like road and bridge, railways, waterway, electricity, telecommunication, water supply, financial institution, ect are needed a lot to be constructed as it can carry out the economic activities and which help in economic development of the country. Not only new infrastructure to be built but also old infrastructure have to be repaired and upgraded. For road and bridge infrastructure which is under the ministry of construction. The government has allocated sufficient budget for both new building and system upgrading to fulfill the increasing infrastructure requirement. For public infrastructure project, mostly it is implemented base on annual budget, and it has both budget and time constraint. Therefore, it is a big challenge to complete the project within budget limitation and defined period. A suitable construction method could be used during the execution of a construction project to reduce construction time and cost. This report proposes two difference construction methods like launching method and temporary support method used in the bridge project. Analysis has carried out to find out key aspect in term of project management and it can help to improve the selection of construction methods for a bridge.